Re: ZDC PB and Log Cabin
do not hold off. her visit is not v=ry important to me
Ok Confirming we will concentrate on log cabin until we get design confirmat=on for New garden at main house Thank you B=ice
Sent from my iPhone
Staging material, rocks and dirt at the lo= cabin have scheduled for today and tomorrow I intended to hold off on any other work at th=t location until after Linda's visit 14th Sept
We have been stock piling dirt for back fill and grade M=, unfortunately the track hoe broke
down
It has been returned, company was unable to locate p=rt. Anoth=r unit has been found from another company, we are waiting for confirmation=on delivery date, Monday or Tuesday next week.
In the mean time the access road behind the MH to propo=ed new site needed work and a slight change of layout so dump truck was not=continually driving over Spetic Tanks located to the South East of Mechanic=l Building.
The storm water pipping from the MH that goes under this road also need w=rk, this work has been completed.
I will send Photos Friday of progress
regards Brice
Brice Gordon<=b>
Stanley, NM
how long to make level with the plan i produced =originally for grading. i assume much of the work can get done wheteh= you are there are not. i will come out late october &nb=p;. to mark out beds so i hope grading finshed by then
Jeffrey
Anticipate completion o= Log Cabin last week of September, and then planned to re mobilize to MH Pr=ject E mail and Photos of progress at Log=Cabin to follow
We will try to meet that deadline,
Reminder its a 9 plus fo=t retaining wall, backfill for 80 percent of area involved, compaction,&nbs=;
=n issue that needs to be addressed,
regards Brice
regards Brice
should we try to transplant some pini=ns out back? dig a hole with fertilizer and fille?
Late winter - spring
Water is key
Sent from my iPhone