Truth Tide TV UNSEALED Epstein Case Files
menu
home Home analytics Reports article Articles auto_stories Narratives mail Email description Documents videocam Videos search Search
policy Investigate expand_more
inbox Inbox 74547 send Sent 28705 label All Mail 74547 attach_file Attachments 1907 topic Topics
People
Jeffrey Epstein person
Ghislaine Maxwell person
Bill Clinton person
Alan Dershowitz person
Elon Musk person
Bill Gates person
Ehud Barak person
Reid Hoffman person
Peter Thiel person
Larry Summers person
Prince Andrew person
Steve Bannon person
Masha Bucher person
Jason Calcanis
Michael Wolff person
Noam Chomsky person
Tom Pritzker person
Al Seckel person
Kimbal Musk person
Karyna Shuliak person
Deepak Chopra person
Ken Starr person
Peter Attia person
Jeremy Rubin person
Neri Oxman person
Marvin Minsky person
Lawrence Krauss person
Seth Lloyd person
Boris Nikolic person
Jean Luc Brunel person
Lesley Groff person
Sarah Kellen person
Nadia Marcinkova person
Darren Indyke person
Mark Epstein person
Emad Hanna person
Joscha Bach person
Rich Kahn person
Cecelia Steen
John Amerling person
Sultan Bin Sulayem person
Matthew Hitzik
Peter Mandelson person
groups People directory
74547 threads 209740 messages
Homechevron_right Emailchevron_right Fw: fiher project
arrow_back

Fw: fiher project

1 message picture_as_pdf Source PDF
C
Cecile de Jongh Dec 1, 2015 12:17 AM
To
Jeffrey Epsteinjeevacation@gmail.com

With warm regards,
Cecile

On Friday, December 4, 2015 5:59 PM, Hector Cintron < > wrote:

Hi Everyone:

Eli send a full detail report in a few days. So far here is a brief description.

• The Ruckus AP that is setup to cover the southside of the island that is installed on the tower where the Dragonwave is not working.

• There was a network loop between the dragonwave and the netgear causing packet drops and unstable network. " Fixed

• Install two switches (Outside shelter. Gym) to be able to monitor both the Dragonwave and Ruckus bridge

• Took out the apple router that was working as DHCP and NAT.

• Brought the Cisco 2921 router online. Now this is the main DHCP and NAT router

• Installed the fiber cable and module for the ViNGN connection. This was installed in Port 5 on the fryer cable that goes to Vessum

• I re-enable the dragonwave management ports so I can verify the configuration

• I changed the password of both radios (the default password was configured Jermaine DI get you the new password so you can file them)

• I added some of basic monitoring. For the dragonwave (I would be able to add full monitoring until I reconfigure the units)

• I added monitoring to the cisco router and the switch in the shelter

We did some testing before we left with youtube and AppleTV and all were working without buffering.

The Dragonwave wit have to be taken offline once the ViNGN circuit goes online. The software on the unit is old and it has some bugs that wil cause issues once the units are up for about 1-2 months. The connection will drop until the unit is rebooted.

Another bug is this error.

Notice:Dec 01 21:55:01 C1N14DGM0075 alarm[544789-11: Critical: Crypto configuration mismatch peer /Morn cleared Notice:Dec 01 21:55:01 C1N14DGM0075 alarm[544789-11: Critical: Crypto configuration mismatch peer /Morn raised

correcting crypto key mismatch to a proper key.
4957 Crypto configuration mismatch alarm raised on new link or radio
swap even if encryption is not enabled on both radios.
1.01.00 1.02.05
170 Counto configuration mismatch alarme not cleared during radio 10100 1.02.05

Will send the rest of the info in the detail report

From: Jermaine Ruan [mailto:
Sent: Friday, December 04, 2015 13:30
To: Omar Welch; Hector Cintron
Cc:
Subject: Fwd: fiber project

Email received from outside of the ATN domain. Lisa caution before using imksrattachments. Good day all.

Hector was able to complete the (Glowing:

  • clear up the network loop that was causing bottle in data follow

  • install the switches to monitor the dragonwaves

  • physical setup for the new router for vingn

To be done:

-vingn to do the physical crossover at stt

-create the tier login id's for dragchwaves

-setup for remote monitoring for island

Regards

Jruan

Sent from my Phone

Begin forwarded message:

From: Hector Cintron -
Date: December 3, 2015 at 7:19:30 PM AST
To: Jermaine Ruan
Cc: Omar Welch Cecile de Jongh Alyster Edwards-
Subject: RE: fiber project

When I left the office I asked Allan and I didn't see the cables. he will be looking into it.

Also just an FYI I logged in the dragonwave to gather some information and I noticed that both Ethernet ports (data and management) on the LSJ side are plugged in to the switch creating a network loop . What I did was shutdown the management port on outside. This will help some but will be fixed tomorrow. I would not be surprised that accessing the internal is smoother now due to

EFTA01139445

lowering of the packet drops and max times

Pings before shuting down the port

Success rate is 98 percent (9876110000). round-trip min/an/max = 1(41128 ms

After

Success rate is 99 percent (9999110000). round-trip min/an/max = 1(4144 ms

From: Jermaine Ruan [mailto: Sent: Thursday, December 03, 2015 17:21 To: Hector Cintron Cc: Omar Welch: Cecile de Jongh; Alyster Edwards Subject: Re: fiber project

Email receNed from outside of the ATN amain. Use cauticn before using Mks/attachments.

HI Hector Terrence stated that the login for dragonwaves we set to factory default .

Regards

Jruan

Sent from my iPhone

On Dec 3. 2015. at 3:52 PM. Hector Ontron wrote:

Hi Jermaine,

I just spoke with omar and the cable hasn't arrived. what we can do is this. Ill split the work on two trips. go tomorrow weather permitting (it's supposed to be sunny) regardless if the VINGN circuit is ready and do the installation. I'll bring up the router and install the 2 switches to be able to monitor the dragonwave and I'll leave the deep inspection and testing for the second trip once VINGN is up.

There will be a downtime of between 1 to 2 hours as I make the changes. If this is acceptable I'm a GO for tomorrow. What I'llneed after the switch installation is the logins for the dragonwave so once this is done I can start with the verification of the link (no changes will be made).

On the second trip I'll go to the island with Alyster takedown the dragonwave to do the following:

  • Test ViNGN circuit

  • Test ViNGN failover

  • Verify all grounding

  • Verify all connectors weatherproofing

  • Verify Lightning arrestors

  • Check all cables and replace cables if needed

  • Upgrade firmware on DW if needed

  • Make configuration changes to the DW if needed

Let me know if this is acceptable.

From: Jermaine [mailto
Sent: Wednesday, December 2, 2015 16:31
To: Omar Welch
Cc: 'Cecile de Jongh'; Alyster Edwards; Hector Cintron
Subject: RE: fiber project

Email received from outside of the ATN domain. Use caution before uang links/attachments.

Good Evening Omar.

I am following up to verify that VINGN is on target for tomorrow and Choice for Friday.

Regards
Jruan

From: Hector Cintron [mailto Sent: Monday, November 30, 2015 5:11 PM To: Jermaine Ruan Cc: Cecile de Jongh; Omar Welch; Alyster Edwards Subject: RE: fiber project

Perfect. you got everything. The PDF only had the fiber from Power and Tel and not the items from curvature. so I just wanted to make sure.

Thanks

From: Jermaine Ruan [mailto Sent: Monday, November 30, 2015 17:03 To: Hector Cintron Cc: Cecile de Jongh; Omar Welch; Alyster Edwards Subject: Re: fiber project

Email received from outside of the ATN domain. Use caution before uang links/attachments. Good day Hector

EFTA01139446

This is not a chart.

Key Information:

  • Item: 2 simplex and 3 duplex cables from power and tel.
  • Item: 1 HWIC module.
  • Item: 1 GLC connector.
  • Sender: Hector Cintron
  • Date: November 30, 2015
  • Time: 4:31 PM

Those are the fiber cable from power and tel. was an order placed for the cutvature items?

Bellow I highlighted the items:

Green are the items from Power and Tel that arrived

Yellow are the items from Culvature that I do not see listed on the PDF

From: Jermaine [mailto

Sent: Monday, November 30, 2015 16:24

To: Hector Cintron: 'Cecile de Jongh'

Cc: Omar Welch: Alyater Edwards

Subject RE: fiber project

Email received from outside of the ATN domain. Use caution before using links/attachments.

Please see attached

From: Hector Cintron [mailto Sent: Monday, November 30, 2015 12:54 PM To: Cecile de Jongh Cc: Omar Welch; Jermaine; Alyster Edwards Subject: RE: fiber project

Jermaine,

Can you send me a list of all the items that you received? I want to make sure we have everything. I just created a BOM to keep track of what is needed and I'm sure I'll adding to the work/pending list

BOM
QTYpartdescInstalledLocationarrivedResponsibility
1CISCO2921/K9Cisco RouterData RoomInstalledChoice
1GLC-BX-DVINGN Simplex Single Mode ModuleIn the cisco routerData RoomLSJ
1VINGN Simplex Cable 35' ST to LCBetween Cisco Router and Patch Panel (coming from STT)Data RoomLSJ
1HWIC-1GE-SFPWIC Card for SFPCisco RouterData RoomLSJ
1MM Duplex fiber cable 6' SC to LCBetween Cisco Router and Patch PanelData RoomLSJ
1GLC-SX-MMMM Fiber ModuleCisco RouterData RoomxChoice
1GLC-SX-MMMM Fiber ModuleCisco 3560Building - GymChoice
1MM Duplex fiber cable 6' SC to LCBetween Cisco 3560 and patch PanelBuilding - GymLSJ
4rackmount screwsfor Cisco 3560Building - GymLSJ
13560G-24Cisco 3560Building-GymChoice
13560G-24Cisco 3560Outside CabinetxChoice
4rackmount screwsfor Cisco 3560 Could use existing from netgearOutside CabinetLSJ

Other Pending Items/Work

Cross Connect STT Beach VINGN
Router Config Info X LSJ
Dragonwave Warrantee Info ??

EFTA01139447

Dragonwave Survey Includes Signal, Firmware, Hardware, Monitoring, Grounding Choice

From: Cecile de Jongh [mailto
Sent: Wednesday, November 25, 2015 13:44
To: Hector Cintron
Cc: Omar Welch; Jermaine
Subject: Re: fiber project

Email received from outside of the ATN domain. Use caution before using links/attachments.

Thank you Hector.

On Nov 25, 2015, at 11:37 AM, Hector Cintron < wrote:

I can only comment about #3

3 — it should, this way I can do a fill integration of the ViNGN. Dragonwave backup. test failover.

The plan that I would like to do:

• install ViNGN via the new router. Test it and switch the island over this new connection (primary)

• Once this is done I can takedown the Dragonwave connection to add some switches to be able to monitor the link and take over maintenance. Once this is complete

• Reconnect the Dragonwave as secondary link

• Test failover to Secondary (DW).

The above plan has a 1-2 min downtime.

If ViNGN is not ready I can still do the install but I need to install the switches needed to monitor the dragonwave there will be a downtime of a few hours as I do the swap but no testing will be done.

Hector.

From: Cecile de Jongh [mailto
Sent: Wednesday, November 25, 2015 10:40
To: Hector Cintron
Cc: Omar Welch; Jermaine
Subject: Re: fiber project

Email received from outside of the ATN domain. Use caution before using links/attachments. Ok. 1. Does this still need to be scheduled with them? 2. II so. do we do that or do you? 3. Does this need to be done before Hector goes to the island or can it be done anytime afterwards? On Nov 25, 2015. at 10:19AM. Hector Cintron wrote:

The crossover does require a visit to the Pole (the one in St Thomas at the beach) where VINGN connects to the fiber the goes to the Island.

From: Cecile de Jongh
Sent Wednesday. November 25.2015 10.17
To: Omar Welch
Cc: Jermaine: Hector Cintron
Subject Re: fiber project

Email received from outside of the ATN domain. Use caution before using links/attachments.

Does this 'crossover require VINGN to visit the site or is it something that is done remotely from their office?

On Nov 25, 2015, at 10:01 AM, Omar Welch <wrote:

Hi Cecile

The connection does play a part in the delay until Monday but not the confirmation for today as no confirmation was made for today. We are assisting ViNGN to be ready for Monday.

'True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation.'

On Nov 25, 2015. at 8:13 AM, Cecile de Jongh wrote:

Email received from outside of the ATN domain. Use caution before using links/attachments.

Good morning Omar and Hector.

Has the date switched to Monday due to the fact that VINGN has not done the crossover? If so. why did Hector confirm today? Will VINGN complete the crossover by Monday?

On Nov 25, 2015, at 9:02 AM. Jermaine < Pl"rote:

Good day Omar

I am not understanding this. As per my conversation. I stated Monday is too long. I started receiving emails from Hector concerning the installation shortly after. One of my last email was confirming tomorrow.

Jruan

EFTA01139448

From: Omar Welch [mailto:
Sent: Wednesday, November 25, 2015 8:55 AM
To: Jermaine
Cc: Hector Cintron; Cece de Jongh
Subject: Re: fiber project

Jermaine per my message Hector will not be able to complete installation until Monday please make arrangements for this. Also we are still awaiting confirmation from VINGN on the cross connect.

'True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation." On Nov 24, 2015, at 3:32 PM, Jermaine wrote:

Email received from outside of the ATN domain. Use caution before using links/attachments. Good Day Hector.

Please be advised. all components are here in the office ready for installation tomorrow. Does VINGN have the crossover in place?

Regards
Jruan

From: Hector Contron [medic.
Sent: Tuesday. November 24. 2015 12:28 PM
To: Jermane Ruan
Cc: Omar Welch
Subject RE. fiber project

Hi Jermaine,

Can you send me a list of the items you have for the install? I want to make sure we have everything before I head over there.

Thanks.

From: Hector Canyon
Sent: Wednesday. November 11. 201510:17
To: *Jermaine Ruan'
Cc: Omar Welch
Subject RE: fiber project

I cannot give you a date sense it's all based on the following:

? VINGN installs the cross connect

? whether we order the parts or LSJ order the parts. This was something that Omar was going to speak to (sorry I do not know the name) LSJ Finance.

o For VINGN connection (Router Module. Fiber Module. Fiber cable)

  • o Choice connection (switches, fiber cables)

Also just an FYI I'll be going on vacation staling this Friday and I'll be back on Monday 20 so assuming all the above is installed. purchased and delivered by the time I get back it would be somata-no the week of the 20

Hector.

From: Jermaine Ruan [mailto
Sent: Wednesday, November 11, 2015 09:52
To: Hector Cintron
Cc: Omar Welch
Subject: Re: fiber project

Email received from outside of the ATN domain. Use caution before using links/attachments.

Good morning gentlemen

The principal is requesting a new date for the fiber. Do you have a suggested estimated time of completion?

Regards

Jruan

Good evening all When is the new date for the connection so I can update my superiors

Regards
Jruan

Sent from my iPhone

On Nov 10. 2015. at 11:25 PM. Hector Cintron wrote:

Hi Guys.

I haven't received notifications that the items that we need to finish came in so that would be no.

From: Omar Welch
Sent: Tuesday. November 10. 2015 10:06
To: Jerrnaine Ruan: Hector Contron
Subject: Re: fiber project

Hector?

EFTA01139449

'True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation."

On Nov 10, 2015, at 6:44 PM, Jermaine Ruan < wrote:

Email received from outside of the ATN domain. Use caution before using links/attachments. Good night Omer

Yep. I am trying to line up the runs in the morning

Regards
Jruan

Sent from my iPhone

On Nov 10. 2015. at 6:19 PM. Omar Welch wrote:

To come to the island?

"True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation."

On Nov 10. 2015. at 6:10 PM. Jermaine wrote:

Email received from outside of the ATN domain. Use caution before using linkstattachments. Good day ornar Is hector still on for tomorrow?

Regards
Jruan

EFTA01139450

1419 files from the DOJ Epstein case media release. All files are public records from justice.gov.

Built by Truth Tide TV