Truth Tide TV UNSEALED 1419 Files ยท 74547 Email Threads
menu
videocam Videos headphones Audio description Documents mail Email analytics Reports article Articles auto_stories Narratives search Search
policy Investigate expand_more
inbox Inbox 74547 send Sent 28705 label All Mail 74547 attach_file Attachments 1907 topic Topics
People
Jeffrey Epstein person
Ghislaine Maxwell person
Bill Clinton person
Alan Dershowitz person
Elon Musk person
Bill Gates person
Ehud Barak person
Reid Hoffman person
Peter Thiel person
Larry Summers person
Prince Andrew person
Steve Bannon person
Masha Bucher person
Jason Calcanis
Michael Wolff person
Noam Chomsky person
Tom Pritzker person
Al Seckel person
Kimbal Musk person
Karyna Shuliak person
Deepak Chopra person
Ken Starr person
Peter Attia person
Jeremy Rubin person
Neri Oxman person
Marvin Minsky person
Lawrence Krauss person
Seth Lloyd person
Boris Nikolic person
Jean Luc Brunel person
Lesley Groff person
Sarah Kellen person
Nadia Marcinkova person
Darren Indyke person
Mark Epstein person
Emad Hanna person
Joscha Bach person
Rich Kahn person
Cecelia Steen
John Amerling person
Sultan Bin Sulayem person
Matthew Hitzik
Peter Mandelson person
groups People directory
74547 threads 209740 messages
arrow_back

Re: 9.6.06EDSA Scope of Work

3 messages picture_as_pdf Source PDF
J
J. Epstein Sep 7, 2006 10:23 PM
To
John Amerling

Is there a price?

--- John Amerling jamerling@rrcaribbean.com wrote:

This has been sent to Darren to permit clarification
of the EDSA scope. I
wanted to make sure that you knew that this was in
process.


EDSA SCOPE OF WORK

EDSA is being engaged to perform two basic
engagements:

  1.  Layout a pathway, biking and hiking trail
    

system outside of the
existing road system and modify the layout of the
existing road system to
accommodate the new uses contemplated by the Master
Plan for the Island
designated as FB-1; and

  1.  provide all landscaping services and
    

documentation which may be
required to implement fully the Master Plan for the
island designated as
FB-1.

The delivery of the services shall be managed by the
Construction Manager,
provided that all matters of aesthetics shall be
determined by the Owner.
All designs and work product shall be provided in
appropriate form and media
to the FTP web site for the project maintained by
the Maguire Group which
shall coordinate and integrate the designs with the
plans and specifications
for the each project contemplated by the Master
Plan.

Such services shall include, without limitation:

  1.  General layout and location of all minor
    

structures, roadways,
walkways, landscape walls, and other site amenities
(fountains, parking,
gathering areas, flag poles, etc.) outside the foot
print of the major
buildings and structures contemplated by the Master
Plan and the hardscape
integral to each such building including the
"Arena."

  1.  Site grading. (but not storm water system
    

design)

  1.   Selection and layout of all plant
    

materials.

  1.  Irrigation system layout.
    
  2.  Design and of all exterior hard services
    

including roadways,
walkways, patios, fountains, landscape walls, and
other special site
amenities outside the footprint of the major
buildings and structures
contemplated by the Master Plan and the hardscape
integral to each such
building including the "Arena."

  1.  Selection and layout of site lighting, but
    

not the electrical
circuitry.

  1.  During construction, selection of plant
    

materials from nursery
stock.

The Landscape design services and documentation to
be provided shall consist
of:

  1.  During the Schematic Design Phase
    

consideration of alternate
materials, systems and equipment and development of
conceptual design
solutions for land forms, lawns and plantings based
on program requirements,
physical site characteristics, design objectives and
environmental
determinants

  1.  During the Design Development Phase
    

consisting of continued
development and expansion of landscape Schematic
Design Documents and
development of outline Specifications or materials
lists to establish final
scope and preliminary details for landscape work

  1.  During the Contract Documents Phase
    

consisting of preparation of
Drawings and Specifications based on approved Design
Development Documents,
setting forth in detail the landscape requirements
for the Project.

  1.  During all phases participating by telephone
    

in design review team
conferences to be held once a month during the
course of such phases.


Do You Yahoo!?
Tired of spam? Yahoo! Mail has the best spam protection around
http://mail.yahoo.com

J
J. Epstein Sep 7, 2006 10:25 PM
To
John Amerling

J.p. is leading this,, I think he wants to design
Brinslely to choose plants I'm not sure about
irrigation.

--- John Amerling jamerling@rrcaribbean.com wrote:

This has been sent to Darren to permit clarification
of the EDSA scope. I
wanted to make sure that you knew that this was in
process.


EDSA SCOPE OF WORK

EDSA is being engaged to perform two basic
engagements:

  1.  Layout a pathway, biking and hiking trail
    

system outside of the
existing road system and modify the layout of the
existing road system to
accommodate the new uses contemplated by the Master
Plan for the Island
designated as FB-1; and

  1.  provide all landscaping services and
    

documentation which may be
required to implement fully the Master Plan for the
island designated as
FB-1.

The delivery of the services shall be managed by the
Construction Manager,
provided that all matters of aesthetics shall be
determined by the Owner.
All designs and work product shall be provided in
appropriate form and media
to the FTP web site for the project maintained by
the Maguire Group which
shall coordinate and integrate the designs with the
plans and specifications
for the each project contemplated by the Master
Plan.

Such services shall include, without limitation:

  1.  General layout and location of all minor
    

structures, roadways,
walkways, landscape walls, and other site amenities
(fountains, parking,
gathering areas, flag poles, etc.) outside the foot
print of the major
buildings and structures contemplated by the Master
Plan and the hardscape
integral to each such building including the
"Arena."

  1.  Site grading. (but not storm water system
    

design)

  1.   Selection and layout of all plant
    

materials.

  1.  Irrigation system layout.
    
  2.  Design and of all exterior hard services
    

including roadways,
walkways, patios, fountains, landscape walls, and
other special site
amenities outside the footprint of the major
buildings and structures
contemplated by the Master Plan and the hardscape
integral to each such
building including the "Arena."

  1.  Selection and layout of site lighting, but
    

not the electrical
circuitry.

  1.  During construction, selection of plant
    

materials from nursery
stock.

The Landscape design services and documentation to
be provided shall consist
of:

  1.  During the Schematic Design Phase
    

consideration of alternate
materials, systems and equipment and development of
conceptual design
solutions for land forms, lawns and plantings based
on program requirements,
physical site characteristics, design objectives and
environmental
determinants

  1.  During the Design Development Phase
    

consisting of continued
development and expansion of landscape Schematic
Design Documents and
development of outline Specifications or materials
lists to establish final
scope and preliminary details for landscape work

  1.  During the Contract Documents Phase
    

consisting of preparation of
Drawings and Specifications based on approved Design
Development Documents,
setting forth in detail the landscape requirements
for the Project.

  1.  During all phases participating by telephone
    

in design review team
conferences to be held once a month during the
course of such phases.


Do You Yahoo!?
Tired of spam? Yahoo! Mail has the best spam protection around
http://mail.yahoo.com

J
J. Epstein Sep 7, 2006 10:25 PM
To
John Amerling

J.p. is leading this,, I think he wants to design
Brinslely to choose plants I'm not sure about
irrigation. Please contact him

--- John Amerling jamerling@rrcaribbean.com wrote:

This has been sent to Darren to permit clarification
of the EDSA scope. I
wanted to make sure that you knew that this was in
process.


EDSA SCOPE OF WORK

EDSA is being engaged to perform two basic
engagements:

  1.  Layout a pathway, biking and hiking trail
    

system outside of the
existing road system and modify the layout of the
existing road system to
accommodate the new uses contemplated by the Master
Plan for the Island
designated as FB-1; and

  1.  provide all landscaping services and
    

documentation which may be
required to implement fully the Master Plan for the
island designated as
FB-1.

The delivery of the services shall be managed by the
Construction Manager,
provided that all matters of aesthetics shall be
determined by the Owner.
All designs and work product shall be provided in
appropriate form and media
to the FTP web site for the project maintained by
the Maguire Group which
shall coordinate and integrate the designs with the
plans and specifications
for the each project contemplated by the Master
Plan.

Such services shall include, without limitation:

  1.  General layout and location of all minor
    

structures, roadways,
walkways, landscape walls, and other site amenities
(fountains, parking,
gathering areas, flag poles, etc.) outside the foot
print of the major
buildings and structures contemplated by the Master
Plan and the hardscape
integral to each such building including the
"Arena."

  1.  Site grading. (but not storm water system
    

design)

  1.   Selection and layout of all plant
    

materials.

  1.  Irrigation system layout.
    
  2.  Design and of all exterior hard services
    

including roadways,
walkways, patios, fountains, landscape walls, and
other special site
amenities outside the footprint of the major
buildings and structures
contemplated by the Master Plan and the hardscape
integral to each such
building including the "Arena."

  1.  Selection and layout of site lighting, but
    

not the electrical
circuitry.

  1.  During construction, selection of plant
    

materials from nursery
stock.

The Landscape design services and documentation to
be provided shall consist
of:

  1.  During the Schematic Design Phase
    

consideration of alternate
materials, systems and equipment and development of
conceptual design
solutions for land forms, lawns and plantings based
on program requirements,
physical site characteristics, design objectives and
environmental
determinants

  1.  During the Design Development Phase
    

consisting of continued
development and expansion of landscape Schematic
Design Documents and
development of outline Specifications or materials
lists to establish final
scope and preliminary details for landscape work

  1.  During the Contract Documents Phase
    

consisting of preparation of
Drawings and Specifications based on approved Design
Development Documents,
setting forth in detail the landscape requirements
for the Project.

  1.  During all phases participating by telephone
    

in design review team
conferences to be held once a month during the
course of such phases.


Do You Yahoo!?
Tired of spam? Yahoo! Mail has the best spam protection around
http://mail.yahoo.com

1419 files from the DOJ Epstein case media release. All files are public records from justice.gov.

Built by Truth Tide TV