Truth Tide TV UNSEALED Epstein Case Files
menu
home Home analytics Reports article Articles auto_stories Narratives mail Email description Documents videocam Videos search Search
policy Investigate expand_more
inbox Inbox 74547 send Sent 28705 label All Mail 74547 attach_file Attachments 1907 topic Topics
People
Jeffrey Epstein person
Ghislaine Maxwell person
Bill Clinton person
Alan Dershowitz person
Elon Musk person
Bill Gates person
Ehud Barak person
Reid Hoffman person
Peter Thiel person
Larry Summers person
Prince Andrew person
Steve Bannon person
Masha Bucher person
Jason Calcanis
Michael Wolff person
Noam Chomsky person
Tom Pritzker person
Al Seckel person
Kimbal Musk person
Karyna Shuliak person
Deepak Chopra person
Ken Starr person
Peter Attia person
Jeremy Rubin person
Neri Oxman person
Marvin Minsky person
Lawrence Krauss person
Seth Lloyd person
Boris Nikolic person
Jean Luc Brunel person
Lesley Groff person
Sarah Kellen person
Nadia Marcinkova person
Darren Indyke person
Mark Epstein person
Emad Hanna person
Joscha Bach person
Rich Kahn person
Cecelia Steen
John Amerling person
Sultan Bin Sulayem person
Matthew Hitzik
Peter Mandelson person
groups People directory
74547 threads 209740 messages
Homechevron_right Emailchevron_right Re: CZM Meeting
arrow_back

Re: CZM Meeting

2 messages picture_as_pdf Source PDF
J
J. Epstein Aug 31, 2006 8:08 PM
To
John Amerling

I'm ok with following theier advice,, document why we
are modifying... r/o intake... talk to miles on
Monday,,I know nothing about it. fine on inspection

--- John Amerling jamerling@rrcaribbean.com wrote:

I SHOULD ADD A POSTCRIPT. IN MY MEETING WITH HODGE
HE WELCOMED THE PROSPECT
OF SELF INSPECTION OF CONSTRUCITON WORK. THE
PRACTICE IS MORE EXPENSIVE, BUT
IT WILL AVOID A LOT OF DELAY.

Here is a summary of what happened today in meeting
with Mr. Oriel and Ms
Peterson;

  1. I showed them portions of our study of our report
    concerning
    existing conditions and future plans.
  2. Ms Peterson suggested that:

a. we take the full buildout drawing, FB 1, and
flesh it out with
phase designations and a brief narrative and submit
it covered by a Minor
Application form;
b. the agency would accept this and then use it as a
baseline document
in connection with future reviews of all
applications

  1. They suggested that both the office and the pool
    related expansions
    be submitted as a modification to Permit

#CZT-53-04L:

a. The modification would seek approval of both the
office and the pool
expansions
b. The modification would mention infrastructure
improvements which we
want to cover, such as trenching for utilities and
placement of pads and
structures to house the R/O expansion
c. The modification would mention the request to add
water to the salt
pond on the grounds that this was a land side, not a
marine issue
d. The cover letter would say that the current minor
application for
the office is being withdrawn; they swore up and
down that the would review
the modification right away and not set the whole
process back.

  1. Mr. Oriel continued to advocate using the base
    permit for the dock
    as the fulcrum for dealing with any changes we
    needed to the barging areas,
    stone in the area of the urchins, floating dock and
    so on; he mentioned the
    need to ask for a waiver of time or "temporary
    removal" of these items from
    the Corps stuff if this were to occur; I was
    non-committal.
  2. On the issue of dock lights we took out the
    approved dock plans
    which do have electrical details; since electrical
    work of one sort or
    another has already been approved, the agency would
    be satisfied if we
    simply sent a letter saying that we are modifying
    those details to the
    extent that we are putting in an emergency light
    system, probably the
    existing letter would suffice.
  3. It appears that once this is done we could and
    would come in with a
    series of minor permit applications for the main
    house, library and so on.
  4. I also took the time to meet with Douglas Hodge
    to go over the
    building permit application process which we are
    initiating for the various
    buildings, which, as you know, will be on a separate
    track; he is primed and
    I want to get the office and pool documents into his
    hands asap.
  5. We did spend some time on the R/O in take issue:

a. When we were on the island yesterday, Mr. Oriel
mentioned that at
one time a new R/O intake line was requested on the
south east side of the
island;
b. Apparently that request was dropped and a line
running out or under
the dock was substituted;
c. What is the scope of the current request?
d. The current master plan does not contemplate a
new intake line; a
new well is contemplated; I would prefer figuring
out a well strategy and
getting away from intake approvals because we get
away from a lot of
bureaucracy in doing so.

  1. There is something in me that makes me nervous
    about withdrawing the
    office permit, but I have the impression that the
    people we are dealing with
    are being honest and they will complete reviews
    promptly.
  2. I am going to get some work done on the master
    plan document and I
    am going to target filing it next week; I should
    like input from you both
    about the content of this message.

Do You Yahoo!?
Tired of spam? Yahoo! Mail has the best spam protection around
http://mail.yahoo.com

J
J. Epstein Aug 31, 2006 8:29 PM
To
John Amerling

In 4 I don't understand the temporary removal..issue..
what was the attitude???

--- John Amerling jamerling@rrcaribbean.com wrote:

I SHOULD ADD A POSTCRIPT. IN MY MEETING WITH HODGE
HE WELCOMED THE PROSPECT
OF SELF INSPECTION OF CONSTRUCITON WORK. THE
PRACTICE IS MORE EXPENSIVE, BUT
IT WILL AVOID A LOT OF DELAY.

Here is a summary of what happened today in meeting
with Mr. Oriel and Ms
Peterson;

  1. I showed them portions of our study of our report
    concerning
    existing conditions and future plans.
  2. Ms Peterson suggested that:

a. we take the full buildout drawing, FB 1, and
flesh it out with
phase designations and a brief narrative and submit
it covered by a Minor
Application form;
b. the agency would accept this and then use it as a
baseline document
in connection with future reviews of all
applications

  1. They suggested that both the office and the pool
    related expansions
    be submitted as a modification to Permit

#CZT-53-04L:

a. The modification would seek approval of both the
office and the pool
expansions
b. The modification would mention infrastructure
improvements which we
want to cover, such as trenching for utilities and
placement of pads and
structures to house the R/O expansion
c. The modification would mention the request to add
water to the salt
pond on the grounds that this was a land side, not a
marine issue
d. The cover letter would say that the current minor
application for
the office is being withdrawn; they swore up and
down that the would review
the modification right away and not set the whole
process back.

  1. Mr. Oriel continued to advocate using the base
    permit for the dock
    as the fulcrum for dealing with any changes we
    needed to the barging areas,
    stone in the area of the urchins, floating dock and
    so on; he mentioned the
    need to ask for a waiver of time or "temporary
    removal" of these items from
    the Corps stuff if this were to occur; I was
    non-committal.
  2. On the issue of dock lights we took out the
    approved dock plans
    which do have electrical details; since electrical
    work of one sort or
    another has already been approved, the agency would
    be satisfied if we
    simply sent a letter saying that we are modifying
    those details to the
    extent that we are putting in an emergency light
    system, probably the
    existing letter would suffice.
  3. It appears that once this is done we could and
    would come in with a
    series of minor permit applications for the main
    house, library and so on.
  4. I also took the time to meet with Douglas Hodge
    to go over the
    building permit application process which we are
    initiating for the various
    buildings, which, as you know, will be on a separate
    track; he is primed and
    I want to get the office and pool documents into his
    hands asap.
  5. We did spend some time on the R/O in take issue:

a. When we were on the island yesterday, Mr. Oriel
mentioned that at
one time a new R/O intake line was requested on the
south east side of the
island;
b. Apparently that request was dropped and a line
running out or under
the dock was substituted;
c. What is the scope of the current request?
d. The current master plan does not contemplate a
new intake line; a
new well is contemplated; I would prefer figuring
out a well strategy and
getting away from intake approvals because we get
away from a lot of
bureaucracy in doing so.

  1. There is something in me that makes me nervous
    about withdrawing the
    office permit, but I have the impression that the
    people we are dealing with
    are being honest and they will complete reviews
    promptly.
  2. I am going to get some work done on the master
    plan document and I
    am going to target filing it next week; I should
    like input from you both
    about the content of this message.

Do You Yahoo!?
Tired of spam? Yahoo! Mail has the best spam protection around
http://mail.yahoo.com

1419 files from the DOJ Epstein case media release. All files are public records from justice.gov.

Built by Truth Tide TV