Hi Rich,
This proposal is from Crystal Comfort.
attached is the first proposal obtained by Merwin from crystal comfort =a company merwin just worked with at caryle hotel) proposal did not =reakout each line item (i have requested this) however pricing was =19,000 as compared to ad winston bid of 357,255 merwin said =ne of the big factors was that crystal comfort is a nonunion shop and =d winston is union
i asked rich barnett to =eview and his comments were:
Rich this contractor did a rush job on walk through he =nbsp;did not write anything down , or account for =lectrical panel costs , piping configuration valve costs , =o re insulation of pipeing included .This quote may be =oming in with a low price up front and charge us for everything =Ise as an extra cost/ exclusion. Lets see where the second contractor =omes in at with his proposal he was very good , spent a lot =f time with the equipment and was very thorough, lets =ee if the second proposal reflects the higher costs =
i still =eed to review bid line by line and verify the validity of rich barnett =omments
second bid should arrive on =onday..