Fwd: Work update Non Priority Items
With =arm regards,
Cecile
Sent from my iPhone and misspellings courtesy of iPhone.
Hi Everyone:
here is a brief description of the non priority items done today.
Installed 2 PoE injectors to the Rockus bridge and AP at the shelter site
Move Ruckus bridge and AP from the netgear router to the 3560 at the shelter
Turn off Netgear switch.
Unplugged old power brick from ups that was not in use at the shelter.
Reconfigure cisco ports (Gym/Shelter) where Rockus bridge are connected (from Access port to Trunk Port)
- Interconnected Choice switch with LSJ switch at the Gym
- Accessed cabinet at Vessum Beach to verify fiber connector (around 5PM)
With today changes I'm now able to monitor the switch at the gym and I was able to route LS1 data vlan to the Rockus AP that points to 5 Palms. Jermaine was able to test the WiFi connection and was able to access the internet via that AP. Also I verified what cable is needed at Vessum. It's a 1 meter, single mode simplex fiber cable ST to ST.
Attached is the changes to the preliminary report. Changes/additions are coded in red.
let me know if you get the cable on Wednesday so I can schedule the installation of the cable at Vessum.
please note
The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jeevacation@gmail.com, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved
lets make sure i have that cable when i fly tomorw
