Truth Tide TV UNSEALED Epstein Case Files
menu
home Home analytics Reports article Articles auto_stories Narratives mail Email description Documents videocam Videos search Search
policy Investigate expand_more
inbox Inbox 74547 send Sent 28705 label All Mail 74547 attach_file Attachments 1907 topic Topics
People
Jeffrey Epstein person
Ghislaine Maxwell person
Bill Clinton person
Alan Dershowitz person
Elon Musk person
Bill Gates person
Ehud Barak person
Reid Hoffman person
Peter Thiel person
Larry Summers person
Prince Andrew person
Steve Bannon person
Masha Bucher person
Jason Calcanis
Michael Wolff person
Noam Chomsky person
Tom Pritzker person
Al Seckel person
Kimbal Musk person
Karyna Shuliak person
Deepak Chopra person
Ken Starr person
Peter Attia person
Jeremy Rubin person
Neri Oxman person
Marvin Minsky person
Lawrence Krauss person
Seth Lloyd person
Boris Nikolic person
Jean Luc Brunel person
Lesley Groff person
Sarah Kellen person
Nadia Marcinkova person
Darren Indyke person
Mark Epstein person
Emad Hanna person
Joscha Bach person
Rich Kahn person
Cecelia Steen
John Amerling person
Sultan Bin Sulayem person
Matthew Hitzik
Peter Mandelson person
groups People directory
74547 threads 209740 messages
Homechevron_right Emailchevron_right Re: I.51 Pavilion
arrow_back

Re: I.51 Pavilion

5 messages picture_as_pdf Source PDF
J
jeffrey E. Mar 7, 2017 5:56 PM

jan 7th plans complete . waited for your call t=day?

J
John P. Woods Mar 8, 2017 5:22 PM

Jeffrey,

Attached is the site plan that incorporates the new t=pographic information. It also shows a slight revision in the bathroom on =he south side based upon our recent discussions. The bathroom will be at t=e same level as the pool deck and we have pushed it back to reduce the hei=ht of the base wall. The tallest wall we have now is 14 feet. We have move= the entire building further west to accomplish this. Our design approach =s to have the building sit on an elevated platform similar to a temple. Th= existing sculpture on the eastern end will be incorporated into the platf=rm as well as two other potential sculpture sites lining up with the palms= We have also looked at the possibility incorporating some large urns at t=ose locations in lieu of sculptures. On the western side, we have develope= two planting areas with palms and shrubs to screen the pool visibly from =he main part of the house. This will require us having to remove the exist=ng stone seat. The eastern side will include a 12 feet wide terrace facing=St. John. I feel we now have a solution that successfully merges the forma=ity of the existing courtyard and pool area within the confines of the exi=ting topography.

J
jeffrey E. Mar 8, 2017 6:46 PM

only survey att=ched.

J
John P. Woods, AIA Mar 10, 2017 8:56 AM

What did you think of the site plan?

J
jeffrey E. Mar 10, 2017 1:01 PM
To
John P. Woods, AIA

i think that without rough elevations it means littl= to me. no reason not to have two floors instead of a wa=l? for example. i need to see rough to see h=w crowded the pool area will fee. in addition the =roblem of the privacey wall / divider is still not done and must be =art of the overall redo

1419 files from the DOJ Epstein case media release. All files are public records from justice.gov.

Built by Truth Tide TV