DPNR visit of 12-20-18
On 12-20-18 DPNR arrived on GSJ just after 12:00 noon and proceeded to dock their boat and 4 members of the party walked across the beach to the tiki area with another staying on the boat.
Karen, Kyle and myself arrived just after 12:30 and introduced ourselves.
The DPNR people asked about permits for the work going on at the beach and if there was any other work under way elsewhere on the island.
They then told us that they did not need any written orders to both instruct us to cease and desist any and all construction or to allow them to access any portion of the island they chose to go to.
At that point they started walking west down the beach and stopped at the equipment parking area at the far west end of the beach and took pictures of the area and likely the excavated hole for the new septic treatment plant and the tanks sitting next to the hole.
Then they headed along the road leading to the dump/dumpster area and took photos of the newly excavated trash pit and the freshly scrapped area with the boat trailers and water wagons parked there.
At that point they walked down to the Christmas Cove barge ramp area and took photos of that area.
After walking back up to the dump area they chose to walk up the road that climbs the hill behind the old ruins building and leads to the Q hut and staff cottage.
I did not follow them at that point as Kyle and Karen were ahead of them on a cart. I walked back to the beach until they got back down there.
As they were walking back to the tiki from the east end of the beach they took notice of the intake pump housing for the desal unit and also the freshly laid sand over the area that had previously been grass.
Karen asked to see the lead person's ID and was asked to show hers also.
As they were getting back onto their boat one of the officers boarded the Zodiac and took pictures of the registration sticker.
After that they all boarded and left the island.