Re:
priority=C24, SHOWER booster pump. stench. . . get me part= numbers and photos of shower control . we can fed ex down. AS=P/ .
dupson stays until fr=day then leaves for 2 weeks. or as he wants. he can stay till end of=aug and leave for two weeks. his choice
get bid on wall builders in stone. . for pool end. 4>=A0
We cannot have landscapers or anyone else=C2*, tell me that they do not know what to do like the guy =n the heli pad with a 4 inch weed whipper.
are still renting a track hoe ??
W= need to be fiscally responsible but not at the cost of expensive de=ays. . we
sent.
=ets buy 2 the storage containers. . if need be they can be fil=ed with block and
Am I reporting on permits or Darren??
darren . no worry . i would like a detailed list of who is working on what, the two landscapers and the guys about the sea weed is an issue we should address
Today Carpenters,
the Wall
Painters
window eves laundry and housing
Then back onto Dock decking
Landscaping
Leveling MC grass, finishing tennis court
Masons
Stone wall at pool
Cabana
Jules and Buck Rocks
Electrical
Dock conduit
By name
Cleaning, chairs and solar light assembly, etc
Basila, Leida, Sonia Johnson
The all, then back to
Hardware
install
Sylvester,
James, Boniface
Painting window eves laundry, then dock Decking, then Wall, then Sealing Cabana's, Master, Library. T1, Oriole, Aiad, Dmitri
Leveling MC grass, finishing tennis court
Peter, Liston, Bernard, Berton, Gael
Pool Cabana Wall
Dupson, Gusneme, One
Dock
Water Runs GSJ, repair ambulance
Sheridan, Dale
Barge
Sorry only today, i want to know if we know where each person is and what they are doing
