Brian's and John's work schedule
FYI,
5 Palms Window installation. The window company brought their three helpers. As part of their contract they needed help lifting the windows in place. L51 workers did help to hold windows as the glass company installed. Brian and John were part of that team.
Brian's Work Schedule:
Monday
• Work on maintenance truck; drill and replace 5 lug nuts
• Helped out in mechanics area as all mechanics weren't remediated
• Cleaned work shop
Tuesday
• Finished manufacturing and installing parts on sun dial
• Demolition of maintenance yard
• Clean Trailers, ready for sale
Wed.
• Fix Nanna Trailer, Every part new
• Installed two new benches with Peter
• Unload Tropical and MSI delivery to 5 Palms
• Finish cleaning out 3 40 Ft containers, relocate items
• Remove manhole cover at flag pole pool
Thurs.
• Install desk at grotto
• Install second desk at post unless
• Help fix JCB
• Deliver cement board to 5 palms
John's work Schedule:
Monday;
- Master bedroom install exterior hooks
- Interior, adjust shutter hold back hook
- New weather strip in relax bathroom and door
TUES;
• Dismantle shelves in trailers and maintenance work shops
Wed.
Reset door stop and weatherstrip in relax room
Complete door, paint and fill with bondo
Work on desk for grotto
- Remove fan housing gazebo/ cottage, repaint two fans
Thurs
- Remove fan housings flag pole, repaint 2 fan housings trailer clean out project, relocate all household small items
Craig