Fwd: Hydroseeder
Good afternoon,
I am sending these pictures as a reminder that something has to be done to repair our Hydro-Seeder. Arron and I have spoken about it several times, but with rainy season coming up, we Need to get it in shape. Especially considering that the Boss has expressed several times in person and via phone and email that he intends to have Us (Landscaping Dept.) Hydro-Seed "The Whole Island" during rainy season, which is upon us.
I feel like it could possibly be repaired, with some good welding and some new parts, or if the decision needs to be made to order a new harness, either way, in its current state it is unsafe, and close to being out of commission, which I'm sure would infuriate the boss, if it was to be down during the time he wants it to be in heavy use.
I know we have a lot of things going on, however I feel this needs to be made a Priority, and I am willing to do what ever I can to assist in getting this piece of vital equipment up to safe, and good working condition.
Jeffrey,
I saw Daphne's e mail with photo's and notice a few items are waiting for equipment.
And I was speaking to Gary about the condition of the equipment and he tells me that he will be looking to rent out some machine because several of the SJ machines are down.
There seems to be a low level of routine preventive maintenance and it ends up costing more in the long run with machine being down and work slowing down and machine's being rented.
Below is an example of work needed to be done for some time on the hydroseeder. Take a look at the photo's below
Thank you
Emad Hanna is a Project Controller at HBRK Associates.