Re: LSJ-Preliminary Pool Concepts
Hi Russell,
Attached are the images we=are developing. There are things that need to be
added and adjusted.
Doors in each arch Plantings for the vi=ual buffer between the MH and Pool
I like where these are going, I think =e need to move the structure away from
the house a few feet, which is a mi=or adjustment.
Thanks,
Bryan
See below
ugly and amateurishl =sorry,
lets not waste a=y more of my time or yours. you can tell him=to stop, its too silly
do you have my steam room numbers/?=C2)did the caterpillar guys go?
Cat guys going in a week
We need to ma=e sure they get a deposit
Yes I have steamroom numbers not br=ken out
It came out to $140,000. Once we come up with a re=l plan i can beat up the numbers we can
buy the stone directly etc
Got it on bryan
i authorized =t days ago. , ill check. you and i need a conversa=ion 1 . if you tell me something is going to happe= , it must happen or i shoudl get an explanation. i really don= want to chase you or anyone for an answer. my trading mentali=y, says if im told cat guys this week , that is what i expect ,Q=A0 brian said end of last week and then end of this week, . and pres=nted , something that is not even worth the time to open the page.=C24, sorry russell. my schedule is swamped with the mar=ets this week, and i am very disappointed in the brian time and work.Q=A0
They are going=this week
no problem , then a note to me that said , either4P=A0 we need an answer , and i will get it in 2 minutes. =C240 or they are not going. last i heard from you