Fwd: I.s.j tile job
FLOORS
remove all existing floor tile- (coral stone) of =abins, (cabanas) #1 # 2 # 3 and # 4 and place in dumpster, 1,654 =f TOTAL $ 4,135
dray pack-level all floors 1,654 sf, TOTAL $ 4,135
install 1,654 sf =f porcelain tile 18x18 on a straight pattern with 1/8 of an inch joint =OTAL 9,097
POOL CABANA
remove all existing floor tile- ( coral stone) and =lace in dumpster, 496 sf TOTAL $ 1,240
dray pack-level entire floor 496 sf, =OTAL $ 1,240
install 496 sf of Carrera barbel tile 18x18 or 12x12 on = straight pattern TOTAL $ 3,7201
STAF =OTAGE
remove all existing floor tile- in the porche, and =lace in dumpster, 569 sf TOTAL $ 1,422
dray pack-level entire floor 569sf, =OTAL $ 1,422
install 569 sf of porcelain tile 18x18 on a straight =attern with 1/8 of an inch joint TOTAL $ 3,129
CABANA-EAST
remove all existing floor tile- ( coral stone) and =lace in dumpster, 153 sf TOTAL $ 382
dray pack-level entire floor 153sf, =OTAL $ 382
install 153 sf of porcelain tile 18x18 on a =traight pattern with 1/8 of an inch joint TOTAL $ =41
BATHROOM CABANA # =
remove all walls and shower floor tile- (coral stone) =32 sf of cabin (cabanas) # EAST place in dumpster, TOTAL
$ =95
Will BE =ONE BY THE HOUR WIHICH IS $30 =ER HR FOR HELPER AND 65 FOR INSTALER, PLUS =ATERIALS
Brice Gordon
CHILAX
remove all existing floor =ile- ( coral stone) and place in dumpster, 324 sf TOTAL $ =10
dray =ack-level entire floor 324 sf, TOTAL $ 810
WATERPROOFING
well be done by sf, $ =.75 per sf this include materials (water proof)
First revised proposal for tile
Russell Hernandez
both chillax and waterproofing were not on original bid =eceived from brice by luciano on 1/26/2018
Richard Kahn
HBRK Associates Inc.
575 =exington Avenue 4th Floor
New York, NY 10022
tel █████████████
fax █████████████
cel █████████████