Truth Tide TV UNSEALED Epstein Case Files
menu
home Home analytics Reports article Articles auto_stories Narratives mail Email description Documents videocam Videos search Search
policy Investigate expand_more
inbox Inbox 74547 send Sent 28705 label All Mail 74547 attach_file Attachments 1907 topic Topics
People
Jeffrey Epstein person
Ghislaine Maxwell person
Bill Clinton person
Alan Dershowitz person
Elon Musk person
Bill Gates person
Ehud Barak person
Reid Hoffman person
Peter Thiel person
Larry Summers person
Prince Andrew person
Steve Bannon person
Masha Bucher person
Jason Calcanis
Michael Wolff person
Noam Chomsky person
Tom Pritzker person
Al Seckel person
Kimbal Musk person
Karyna Shuliak person
Deepak Chopra person
Ken Starr person
Peter Attia person
Jeremy Rubin person
Neri Oxman person
Marvin Minsky person
Lawrence Krauss person
Seth Lloyd person
Boris Nikolic person
Jean Luc Brunel person
Lesley Groff person
Sarah Kellen person
Nadia Marcinkova person
Darren Indyke person
Mark Epstein person
Emad Hanna person
Joscha Bach person
Rich Kahn person
Cecelia Steen
John Amerling person
Sultan Bin Sulayem person
Matthew Hitzik
Peter Mandelson person
groups People directory
74547 threads 209740 messages
Homechevron_right Emailchevron_right Fwd: N120.1E GIV entrance veneer
arrow_back

Fwd: N120.1E GIV entrance veneer

3 messages picture_as_pdf Source PDF
W
Wendy Mar 16, 2018 2:20 PM
To
Pete Rawson

Good afternoon Pete,

Please find below estimate; give me a call with any q=estions.

FWD and AFT MED Bulkheads =/span>

  • &nbs=; Remove the FWD and AFT MED bulkheads.

  • &nbs=; Disassemble the Components, remove all Hardware (Latches, Hinges, and=Tracks etc.) from Woodwork and retain for re-use. All components will=be inspected. Any Hardware Damage will be reported to the Customer prior to repairing o= replacement. All repairs or replacement will be performed on a "Time and Mater=al" basis.

  • &nbs=; Strip and remove existing veneer and replace with new.

Q The veneer will be stained to match existing veneer in a/c using a cu=tomer-approved color. (NOTE: CCI CANNOT guarantee that new veneer will be an e=act match in grain or color to existing veneer. Woodwork is a natural mater=al and has variances in both grain configuration and stain acceptance. = Wood is susceptible to change over time prompted by exposure to light, heat and other elements.)

  • &nbs=; Re-finish all surfaces using a polyurethane high-build controlled met=od. Final coat will be gloss finish.

  • &nbs=; Re-assemble all components and re-install all removed hardware. =

  • &nbs=; Re-install the bulkheads.

=o:p>

Estimated Labor &nb=p; $ 15,440.00

Estimated Material &=bsp; $ 3,720.96

Certification &n=sp; =$ 900.00

TOTAL &n=sp; =nbsp; $ 20,060.96

=o:p>

=o:p>

Cabin Door

• &nbs=; Remove the cabin door.

• &nbs=; Fabricate and install an aluminum plate to conceal damaged veneer aro=nd door knob.

  • &nbs=; Re-assemble door and re-install door knob.

  • &nbs=; Re-install door.

=0:p>

Estimated Labor and Material &nb=p; $ 902.00

SCHEDULING

We will offer a turn t=me to meet your individual needs and will be ready to work around the Aircr=ft Flight Schedule. We estimate a lead-time of "2 WEEKS" will be required to order and receiv= materials, prepare our shops and prepare related documentation at this tinI.. - Final parts lead-time will be confirmed upon our receipt of a signe= proposal.

DOWNTIME=/b>

We will require a total of "10 Working Days" from the scheduled start dat= to accomplish the work as defined in this proposal.

</=pan>

=0:p>

=/p>

Wendy Pimentel

Sales Manager

P
Pete Rawson Mar 16, 2018 9:38 PM

Pete Rawson
Chief Inspector
Meridian Jet Center

L
Larry Visoski Mar 17, 2018 2:00 AM
To
Je vacation
Cc
Rich Kahn

Pete and I had cabin crafters from Teterbor= give a quote in reference to the entrance veneer and Aft side cabin door o= the GIV

1-Plane Perfect interior in PBI quoted $23k for entra=ce Venere forward and aft and aft side of cabin door, new veneer.,

2-Cabin craters quoted $20,060.98 for entrance Venere=forward and aft only, they quoted to install a chrome metal plate around th= door handle, they did not quote veneer on the aft side of c=binet door as I requested.

3-need quote from Eric R=th if you elect to have him work the GIV veneer.,

= week lead time for the veneer according to Cabin Crafters in Teterboro.&nb=p;

Sent from my iPhone

1419 files from the DOJ Epstein case media release. All files are public records from justice.gov.

Built by Truth Tide TV