Fwd: N120.1E GIV entrance veneer
Good afternoon Pete,
Please find below estimate; give me a call with any q=estions.
FWD and AFT MED Bulkheads =/span>
&nbs=; Remove the FWD and AFT MED bulkheads.
&nbs=; Disassemble the Components, remove all Hardware (Latches, Hinges, and=Tracks etc.) from Woodwork and retain for re-use. All components will=be inspected. Any Hardware Damage will be reported to the Customer prior to repairing o= replacement. All repairs or replacement will be performed on a "Time and Mater=al" basis.
&nbs=; Strip and remove existing veneer and replace with new.
Q The veneer will be stained to match existing veneer in a/c using a cu=tomer-approved color. (NOTE: CCI CANNOT guarantee that new veneer will be an e=act match in grain or color to existing veneer. Woodwork is a natural mater=al and has variances in both grain configuration and stain acceptance. = Wood is susceptible to change over time prompted by exposure to light, heat and other elements.)
&nbs=; Re-finish all surfaces using a polyurethane high-build controlled met=od. Final coat will be gloss finish.
&nbs=; Re-assemble all components and re-install all removed hardware. =
&nbs=; Re-install the bulkheads.
=o:p>
Estimated Labor &nb=p; $ 15,440.00
Estimated Material &=bsp; $ 3,720.96
Certification &n=sp; =$ 900.00
TOTAL &n=sp; =nbsp; $ 20,060.96
=o:p>
=o:p>
Cabin Door
• &nbs=; Remove the cabin door.
• &nbs=; Fabricate and install an aluminum plate to conceal damaged veneer aro=nd door knob.
&nbs=; Re-assemble door and re-install door knob.
&nbs=; Re-install door.
=0:p>
Estimated Labor and Material &nb=p; $ 902.00
SCHEDULING
We will offer a turn t=me to meet your individual needs and will be ready to work around the Aircr=ft Flight Schedule. We estimate a lead-time of "2 WEEKS" will be required to order and receiv= materials, prepare our shops and prepare related documentation at this tinI.. - Final parts lead-time will be confirmed upon our receipt of a signe= proposal.
DOWNTIME=/b>
We will require a total of "10 Working Days" from the scheduled start dat= to accomplish the work as defined in this proposal.
</=pan>
=0:p>
=/p>
Wendy Pimentel
Sales Manager
Pete Rawson
Chief Inspector
Meridian Jet Center
Pete and I had cabin crafters from Teterbor= give a quote in reference to the entrance veneer and Aft side cabin door o= the GIV
1-Plane Perfect interior in PBI quoted $23k for entra=ce Venere forward and aft and aft side of cabin door, new veneer.,
2-Cabin craters quoted $20,060.98 for entrance Venere=forward and aft only, they quoted to install a chrome metal plate around th= door handle, they did not quote veneer on the aft side of c=binet door as I requested.
3-need quote from Eric R=th if you elect to have him work the GIV veneer.,
= week lead time for the veneer according to Cabin Crafters in Teterboro.&nb=p;
Sent from my iPhone