Re: ZDC century link lines
No content available.
Attached photos for your reference
Basic Armageddon happen on the phone system Lightening strike RC Water in Two splices One seriously pissed off rodent chew 25 pair at lodge
Status
The repair to the copper centurylink lines completed All lines at RC and LV house are fixed Fire alarm line main house, fixed Lodge and log cabin fixed
One 10 ft 50 pair splice
Can we proceed with paying in cash,
I would like to pay these guys as they really stepped up to plate on this one
Rich
Attached photos for your reference
Basic Armageddon happen on the phone system Lightening strike RC Water in Two splices One seriously pissed off rodent chew 25 pair at lodge
Status
The repair to the copper centurylink lines completed All lines at RC and LV house are fixed Fire alarm line main house, fixed Lodge and log cabin fixed
One 10 ft 50 pair splice One 10 ft 25 pair splice
250 ft of new cable for lodge and lodge cabin plus other misc material were used cost $560
2 guys for 5 days, 8 plus hours per day
Total cost for material and labor $4160.00 Please note the following, we have completely separated the main house phone system from lodge and log cabin Due to time restraints I elected to use the century link JEE emergency line and the secondary fire alarm line to get though the visit We will need to sort this out later, after the visit
As explained this was a cash deal
Sorry this started with the wrong e mail My mistake=C2
Sent from my iPhone
No w=uld like to review with you in detail as I was unaware of entire situation=which happened over 10 days ago. Paying 4000 cash to vendors is not accept=ble and should be discussed over the phone not sent over email.
Sent from my iPhone
Sent from my iPh=ne
So you would prefer to pay Amtel =ates to do this work
I had no choice
I will spea= with Jeffrey directly about this
Thx for your support =A0
And who the ccd per on this
Sent from my iPhone
pay it, and then we will talk during the week