Truth Tide TV UNSEALED Epstein Case Files
menu
home Home analytics Reports article Articles auto_stories Narratives mail Email description Documents videocam Videos search Search
policy Investigate expand_more
inbox Inbox 74547 send Sent 28705 label All Mail 74547 attach_file Attachments 1907 topic Topics
People
Jeffrey Epstein person
Ghislaine Maxwell person
Bill Clinton person
Alan Dershowitz person
Elon Musk person
Bill Gates person
Ehud Barak person
Reid Hoffman person
Peter Thiel person
Larry Summers person
Prince Andrew person
Steve Bannon person
Masha Bucher person
Jason Calcanis
Michael Wolff person
Noam Chomsky person
Tom Pritzker person
Al Seckel person
Kimbal Musk person
Karyna Shuliak person
Deepak Chopra person
Ken Starr person
Peter Attia person
Jeremy Rubin person
Neri Oxman person
Marvin Minsky person
Lawrence Krauss person
Seth Lloyd person
Boris Nikolic person
Jean Luc Brunel person
Lesley Groff person
Sarah Kellen person
Nadia Marcinkova person
Darren Indyke person
Mark Epstein person
Emad Hanna person
Joscha Bach person
Rich Kahn person
Cecelia Steen
John Amerling person
Sultan Bin Sulayem person
Matthew Hitzik
Peter Mandelson person
groups People directory
74547 threads 209740 messages
Homechevron_right Emailchevron_right Re: LS1 Cable
arrow_back

Re: LS1 Cable

10 messages picture_as_pdf Source PDF
R
Richard Kahn Apr 28, 2016 12:32 PM

it was a pleasure speaking with you earlier. as discussed the following areas are scopes that will not be needed and my comments:

a) conceptual design on cable routes - ok to keep - please revisit pricing
b) detailed cable specs and preparation of bid docs - ok to keep - please revisit pricing
c) detailed switch and meter design and prep of all switches and metering device - ok to keep - please revisit pricing
d) review all switch and cable bid submittals and submit to Wapa for approval - ok to keep - please revisit pricing
e) witness factory acceptance test - not necessary as all we need is for you to review test from manufacturer and should be included in d) above
ok to keep - please revisit pricing
g) witness installation and test electrical devices - not needed
h) complete as builts - not needed

i appreciate your effort in revisiting your pricing and look forward to hearing back from you this afternoon

thank you

Richard Kahn
HBR Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 1022
tel 212-971-1306

fax 646-350-0954
cell 917-414-7584

H
Hugo Hodge Apr 30, 2016 10:27 AM
To
Mr. Kahn

Good morning Mr.Kahn,

I have thoroughly reviewed your suggestions for modifications to the bid and given your request great consideration. I honestly believe that the items you requested are important for a successful project. For example, the witnessing of the factory acceptance is not a step I would recommend omitting.

With that said, the items you suggested to remove total $23,000. To ensure the integrity of this project I am willing to do the project with the entire scope at the original price less $23,000 for a total of $80,000. If you decline this option and are convinced that these items should be omitted, I am willing to reduce the remaining items by 10% resulting in a cost of $72,000 for the revised scope.

I strongly recommend you consider the first option but I am willing to discuss this further with you if necessary.

Best Regards,

Hugo Hodge Jr

R
Richard Kahn Apr 30, 2016 4:04 PM

Thank you for your email. as i told you when we spoke last week I have a bid for 40k. my instructions are to source locally if i can and save travel costs I will increase my offer to you and for 50k we can proceed with your proposal. amy dempsey is being retained for routing.

Thank you.

Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue, 4th Floor
New York, NY 10022
Tel 212-971-1306
Fax 646.350-0954
Cell 917-414-7584

H
Hugo Hodge Apr 30, 2016 8:38 PM
To
Richard Kahn

With the greatest respect for you and your client, I'm sorry but HKT will have to respectfully decline to accommodate that offer.

Apparently you have someone off island, unaware of the local requirements and hopefully the cost you are expecting to pay will not increase when they acquire that knowledge.

$50k is more than 50% below the proposal and, for lack of better words, quite unacceptable and insulting.

Should you run into difficulties with your other option HKT stands prepared to deliver first class results as described in our written and verbal communication.

R
Richard Kahn May 1, 2016 1:55 PM

my client is very island centric. no insult meant at all, and i apologize if you felt slighted. can you give me your best and final price so that i may once again review all alternatives and then prepare one final apples to apples analysis. Thank you.

Rich

Sent from my iPhone

H
Hugo Hodge May 1, 2016 4:33 PM
To
Richard Kahn

No Sir, $5k off each option. That means $80k $5k for a total of $75k for the all inclusive scope and $72k - $5k for a total of $67k for the reduced scope.

H
Hugo Hodge Jr. May 2, 2016 8:33 PM
To
Richard Kahn

Good evening,

I didn't hear back from you. Do we have a deal?

HH

H
hbrkscanner@gmail.com May 3, 2016 9:20 AM
To
richardkahn12@gmail.com

please note

The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE

Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jeevacation@gmail.com, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved

R
Richard Kahn May 3, 2016 1:21 PM

a few updates:

a) i have attached PDF which overviewed previous analysis from 2002-2003

b) hugo hodges wants to know if we have a deal at 72k for entire original quote or 67k for ails steps without as builts and witnessing installation and testing devices

c) finally connected with Prysmian Group and am now waiting on their submarine division to contact me so i can give them specifics of what to quote

please advise on Hugo response
thank you

MaryAnn Daley
Inside Sales Manager
IEC, Crane, Mining, Industrial & Specialties
Prysmian Group

Linking the Future

  • Company: Prysmian Cables N.A.
  • Address (from surrounding text): 700 Industrial Drive – C24, Lexington, SC 29072, USA
  • Image content: large black redaction bar covering contact details
  • Visible labels to left of bar: "T+", "M+", "F+" (likely Telephone, Mobile, Fax)
  • Small chevron/arrow at right of the bar (possible link/icon)
  • Key point: phone/mobile/fax numbers are redacted/hidden.

Prysmian Cables N.A.
700 Industrial Drive=C24,
Lexington, SC 29072
USA

www.prysmiangroup.com

J
jeffrey E. May 3, 2016 6:36 PM
To
Richard Kahn

67

1419 files from the DOJ Epstein case media release. All files are public records from justice.gov.

Built by Truth Tide TV