Fwd: ZDC Microwave Link
the FCC licensing process is in process and we are waiting for a confirmation. We expect it by NLT Wednesday
Once that is complete we will verify the equipment availability
Best regards,
Chris Cappiello
Director of Business Development
Future Technologies Venture, LLC
Good Afternoon
Any updates regarding microwave path from Sandia Crest to Ranch regards Brice
Sent from my iPhone
Thank you
Sent from my iPhone
Hey Brice and Richard,
Do you have time today at 4 or 5 EST to catch up on this project?
Best regards,
Chris Cappiello
Director of Business Development
Future Technologies Venture, LLC.
either time works for me
Richard,
Do you have a preference?
Best regards,
Chris Cappiello
Director of Business Development
Future Technologies Venture, LLC
lets do 4pm EST
thanks
Richard Kahn
HBRK Associates Inc.
Hello Richard and [redacted]
I hope all is well.
Per our discussion earlier this week we follow up with =ragonwave on an exact date of delivery. Dragonwave has informed us that =he radios (Long lead item) would ship by no later than 7/29.
Net of this, we would like to plan for the following to help =itigate the timing delay of the radio arrival and try to keep the =nstallation timing as tight as possible and stick to the original solution using =he Enhanced Multi-Carrier solution.
Sequence of Events:
- Pre-ship all materials besides the radios (To arrive in =arket the week of 7/25 or earlier)
- Antennas, Mounts, Installation Materials, Cable, etc.
• FT build crew to arrive in market on Sunday 7/31/16
• FT will begin the construction on 8/1/16 starting with the =ain Residence Location
• Once the main residence location is complete, we will move to =andia Crest
• By the time FT is CONSTRUCTION COMPLETE on both ends the =adios will arrive in market.
• FT will then pre-configure the radios at the main residence =ocation and then install them on
each end
• Once the radios are installed, FT will begin the link =lignment. (We would expect to be at this point by Friday 8/5/16
• In the case the Sandia Crest to Main Residence location does =ot meet the performance requirements, we will then go build the ZDC tower and relay the connection through =here
Please review and let us know if we can move forward on this =asis.
We need your confirmation, so that we can finalize the FCC =icensing to be the enhanced multi-carrier product. Our preference would be to maintain this plan, but will defer to you for guidance.
NOTE: We are of course trying to see if we can make any =mprovements on the timelines, but this would be what we feel is =onservative planning, based on the information we have.
Thanks again!
Best regards,
Chris Cappiello
Director of Business =evelopment
Future Technologies =enture, LLC
attached is email with proposed worst case dates for Zorro =icrowave install future tech was waiting for latest =echnology on dragon wave which is causing a potential 2-3 week pushback =rom original planned completion date of July 15th email below states that they would begin testing 8/5/2016 and = would add an extra week for potential unforeseen issues i am concerned this will interfere with your planned =isit please advise thank =ou
FYI - future tech feels confident that =hey can go directly from sandia crest to main house (still need to work out issues on pole height and or new pole =t main house which future tech will install for us)
Richard Kahn
HBRK Associates Inc.