Truth Tide TV UNSEALED Epstein Case Files
menu
home Home analytics Reports article Articles auto_stories Narratives mail Email description Documents videocam Videos search Search
policy Investigate expand_more
inbox Inbox 74547 send Sent 28705 label All Mail 74547 attach_file Attachments 1907 topic Topics
People
Jeffrey Epstein person
Ghislaine Maxwell person
Bill Clinton person
Alan Dershowitz person
Elon Musk person
Bill Gates person
Ehud Barak person
Reid Hoffman person
Peter Thiel person
Larry Summers person
Prince Andrew person
Steve Bannon person
Masha Bucher person
Jason Calcanis
Michael Wolff person
Noam Chomsky person
Tom Pritzker person
Al Seckel person
Kimbal Musk person
Karyna Shuliak person
Deepak Chopra person
Ken Starr person
Peter Attia person
Jeremy Rubin person
Neri Oxman person
Marvin Minsky person
Lawrence Krauss person
Seth Lloyd person
Boris Nikolic person
Jean Luc Brunel person
Lesley Groff person
Sarah Kellen person
Nadia Marcinkova person
Darren Indyke person
Mark Epstein person
Emad Hanna person
Joscha Bach person
Rich Kahn person
Cecelia Steen
John Amerling person
Sultan Bin Sulayem person
Matthew Hitzik
Peter Mandelson person
groups People directory
74547 threads 209740 messages
Homechevron_right Emailchevron_right (no subject)
arrow_back

(no subject)

3 messages picture_as_pdf Source PDF
B
Brice Gordon May 16, 2009 4:52 AM
To
JEE

Attached is a basic plan for the build out of the existing Mechanical and Engineering. Some of these ideas have been suggested separately, but this plan ties everything together, for a total overview.

  1. Fit out New Mechanical Building with the following:
  • 2 x generators & switch gear, fire suppression equipment

  • 2 x Fuel Tanks

  • 1 x new RO system, poly tanks below for water storage

  • TI & Data/fiber Distribution Room.

  1. Replace existing Metal Structure at engineering with a larger enclosed shelter to accommodate the servicing of heavy machinery, basic refurbishment of existing tool storage areas.

  2. Lay a concrete pad and retaining wall between Mechanical and Engineering buildings for fuel truck storage and oil containment. This would satisfy DPNR requirements for such storage.

  3. Erect a new enclosed Metal structure to house 3 ax 40' containers for hurricane storage, landscape material and a parking area for atv's, polaris's etc. This location would be above flood Plain.

  4. Terrace area as you suggest, below proposed Heli Pad parking area and metal structure below

Should we proceed with estimating expenditure for each phase of this plan?
For your consideration.
Regards Brice

B
Brice Gordon May 16, 2009 9:30 AM
To
J Epstein

Curtis is working on budget draft, will confirm with him when you should expect to receive it.

I will forward photo's today. Please note Trackhoe had blown head, Rock Crusher should be up and running next week.

In regard to Scott Graff, needed to find replacement before releasing as there is no body on staff able to perform this task. I discussed this with you in December. As I mentioned yesterday, Adam Cook might be able to provide this service and we will be able to get rid of Graff. Brice

J
Jeffrey Epstein May 16, 2009 10:05 AM

i would like to know,when I will receive my genslre very rought draft of budget and timetable.. , why when in my nov notes. it says we agreed to rid of scott graff. that this has not happened.. I would like to see photos of the gravel that we are making and the hydroseeding please.. thanks as always