FW: LSJ - Pool and Main Residence
Guys, any word from Jeffrey on how he wants to proceed?
Warwick
Warwick Wicksman, AIA
Principal
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
FYI Ft let's get the doe's going, include the spa Sent from my iPhonc
Yes fl
Sorry for all the typos .Scut from my iPhonc
Jeffrey
were the 11/3 F1 or F2 schemes close enough to your concept to have Gensler take one of them to the next level and contract? also should they be producing a schematic for the SPA to review
Hi Gary,
Attached is our proposal for the pool area and main residence. This is to develop the current scheme, for just this area, to a Schematic Design level. Once that is done, assuming there are no major changes, we will provide a separate proposal to prepare construction documents and engineering as necessary. This will simply the CD phase, and simply the work of any required consultants.
I am working on proposals for conceptual design services the Spa and Guest Cottage, and will send them on Monday.
Thanks,
Warwick
Warwick Wicksman, AIA
Principal
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
Jeffrey
This fee is in line with schematic design per my estimate I reccomend you approve. Gary
