Truth Tide TV UNSEALED Epstein Case Files
menu
home Home analytics Reports article Articles auto_stories Narratives mail Email description Documents videocam Videos search Search
policy Investigate expand_more
inbox Inbox 74547 send Sent 28705 label All Mail 74547 attach_file Attachments 1907 topic Topics
People
Jeffrey Epstein person
Ghislaine Maxwell person
Bill Clinton person
Alan Dershowitz person
Elon Musk person
Bill Gates person
Ehud Barak person
Reid Hoffman person
Peter Thiel person
Larry Summers person
Prince Andrew person
Steve Bannon person
Masha Bucher person
Jason Calcanis
Michael Wolff person
Noam Chomsky person
Tom Pritzker person
Al Seckel person
Kimbal Musk person
Karyna Shuliak person
Deepak Chopra person
Ken Starr person
Peter Attia person
Jeremy Rubin person
Neri Oxman person
Marvin Minsky person
Lawrence Krauss person
Seth Lloyd person
Boris Nikolic person
Jean Luc Brunel person
Lesley Groff person
Sarah Kellen person
Nadia Marcinkova person
Darren Indyke person
Mark Epstein person
Emad Hanna person
Joscha Bach person
Rich Kahn person
Cecelia Steen
John Amerling person
Sultan Bin Sulayem person
Matthew Hitzik
Peter Mandelson person
groups People directory
74547 threads 209740 messages
Homechevron_right Emailchevron_right Fwd: Barge List
arrow_back

Fwd: Barge List

3 messages picture_as_pdf Source PDF
B
Boscoe Apr 13, 2015 12:22 PM
To
Gene at Subbase Drydock

The following is the list I discussed with Gene at Subbase Drydock today 4/13/2015.

He is familiar with it and is now submitted for your review.

Inspect and Repair the following;

  1. Rudders.

  2. Steering Gear.

  3. Hydraulic Cylinders.

  4. Exhaust system

  5. Engine Mounts and alignment

  6. Stuffing boxes/seals.. Install new units

  7. Cutlass bearings

  8. Engine Cooling Grid Coolers and Zinks

  9. Bottom Paint and Barrier Coat/ Hull Zinks

  10. Engine and marine gear control bracket work.

  11. Fuel tank clean out. Port and starboard

  12. Starboard deck fuel fill adapter replacement

  13. Bilge pumping system forward compartments

  14. Repair existing 24 volt alternator and add a second one to port motor.

  15. Inspect and size all hydraulic lines and fittings as needed.

  16. Engine and marine gear instruments in control tower

  17. Install engine room lighting

  18. Tune and service both engines and marine gear.

  19. Clean and paint engine room.

Timing of work:

I have been told this haul out must be done in late April or May as there is scheduled and contracted work reported for this facility during June, July and August.

Please, respond with any questions you may have.

█
█████████ Apr 13, 2015 6:29 PM
To
█████████
Cc
multiple recipients (several redacted; visible fragments include @gmail.com addresses)

Hey Boscoe,

Please see questions ----?
I need a clear understanding of the listed items, What parts should we purchase and What can be done in house.

1. Rudders. What should be done?
2. Steering Gear.-----Did we buy the parts for this?
3. Hydraulic Cylinders. What need to be done?
4. Exhaust system:----- What are the issues?
5. Engine Mounts and alignment.----- (Ok!)
6. Stuffing boxes/seals. Install new units:----- Should we buy the new units?
7. Cutlass bearings. ----- Do we need to purchase?
8. Engine Cooling Grid Coolers and Zinks. ----- What need to be done?
9. Bottom Paint and Barrier Coat/ Hull Zinks. ----- Should we purchase?
10. Engine and marine gear control bracket work. ----- Do we need to purchase?

2

EFTA_R1_01430245
EFTA02397250

  1. Fuel tank clean out. Port and starboard. Ok!

  2. Starboard deck fuel fill adapter replacement. --- Should we replace or fix?

  3. Bilge pumping system forward compartments. What about the forward compartments?

  4. Repair existing 24 volt alternator and add a second one to port motor. ----- Should we purchase? 1.S. Inspect and size all hydraulic lines and fittings as needed. (Ok!)

  5. Install engine room lighting. ---- (Ok!)

  6. Tune and services both engines and marine gear. ----- Any parts need?

  7. Clean and paint engine room. ---- (Ok!)

A
Ann Rodriquez Apr 13, 2015 6:47 PM
To
jeffrey E.

Ann R.

Begin forwarded message:

Ok.

1

Rudders must be removed and the lower portion must be renewed to proper dimension. They are worn to the point of failure and vibrate badly.

2

We bought pumps and pulleys we can install but I am referencing the gear in the aft compartment that is the hydraulic actuator and linkage for the rudders

3

The cylinders were damaged at sea due to improper installation and subsequent damage from a broken fitting. The ramp was secured with a safety strap but still pulled the top sealing portion out of the cylinder.

The fit of the mounts needs to be remedied at this time. The cylinders work now but are not repairable. Evaluation while being removed to correct and improve the mounting is necessary at a minimum.

4

The exhaust was assembled without funding to get the barge off the dock at the last haulout. It is not properly assembled or supported nor is it insulated.

6

We have new ones but need new mounting hoses And must be done out of the water

7

Bearings must be purchased. I think SBDD has them

1

EFTA_R1_01430244
EFTA02397249

8 Inspection and new sacrificial sinks installed. 9 SBDD should provide this but it can be discussed. 10 Machine shop work SBDD 12 This should be done at the same time the tank is cleaned. 13 Watertight compartments forward would need to be dewatered if breached. There is no ability to do so at this time except fit the first two compartments that are joined as one due to a hole in the bulkhead.

16
The gauges for oil and temp and rpm are not accurate. One over temperature alarm is not working as well.

18
Parts.... As needed by inspection.

Sent from my iPhone

1419 files from the DOJ Epstein case media release. All files are public records from justice.gov.

Built by Truth Tide TV