Truth Tide TV UNSEALED 1419 Files ยท 74547 Email Threads
menu
videocam Videos headphones Audio description Documents mail Email analytics Reports article Articles auto_stories Narratives search Search
policy Investigate expand_more
inbox Inbox 74547 send Sent 28705 label All Mail 74547 attach_file Attachments 1907 topic Topics
People
Jeffrey Epstein person
Ghislaine Maxwell person
Bill Clinton person
Alan Dershowitz person
Elon Musk person
Bill Gates person
Ehud Barak person
Reid Hoffman person
Peter Thiel person
Larry Summers person
Prince Andrew person
Steve Bannon person
Masha Bucher person
Jason Calcanis
Michael Wolff person
Noam Chomsky person
Tom Pritzker person
Al Seckel person
Kimbal Musk person
Karyna Shuliak person
Deepak Chopra person
Ken Starr person
Peter Attia person
Jeremy Rubin person
Neri Oxman person
Marvin Minsky person
Lawrence Krauss person
Seth Lloyd person
Boris Nikolic person
Jean Luc Brunel person
Lesley Groff person
Sarah Kellen person
Nadia Marcinkova person
Darren Indyke person
Mark Epstein person
Emad Hanna person
Joscha Bach person
Rich Kahn person
Cecelia Steen
John Amerling person
Sultan Bin Sulayem person
Matthew Hitzik
Peter Mandelson person
groups People directory
74547 threads 209740 messages
arrow_back

Re: Ken Floyd: VI Paving

6 messages picture_as_pdf Source PDF
K
Ken Floyd Jun 7, 2017 4:33 PM

Good Afternoon,

Both of these sketches are labeled LSG, which I take to mean they are not of GSG. Could I get a scale drawing of the Topo for GSG?

Thank you very much,

With Respect,
Kenneth Floyd, Virgin Islands Paving
General Manager, STT

A
Ann Rodriquez Jun 7, 2017 6:47 PM
To
Ken Floyd

Hi Ken,

The owner would like to see the turn out of LSJ "Road Paving" before we proceed with GSJ.

We would like to start LSJ asap. Can you please revisit your bid and give us the best deal possible as we would also like to proceed with GSJ right after our LSJ paving project.

Please advise,

Ann R.

R
Richard Kahn Jun 9, 2017 2:43 PM

Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022

K
Ken Floyd Jun 9, 2017 3:28 PM
To
Ann Rodriquez
Cc
Jermaine Ruan

Good Morning, Ann,

Please do not take offense at anything I am writing here, as you asked me to put down my issues in an email. Primarily, because we could not have a correspondence call via phone.

It appears we are again at the same place, at a different time.

The only difference is the idea of, "Economy of scale", by holding out the possibility of doing GSG as a reason to give a lower price.

The idea behind a better price due to increased quantities is logical; if the extra work is included in the schedule of values and Schedule of work.

It appears the viability of the project hinges on the ability of the owner to maintain a location of privacy, a position of which I respect and am totally committed.

However, requirements such as these do not mix well with expedition and even more important to me, quality.

In Civil work, especially involving a product such as asphalt, which needs to be protected from fast running water and standing water in order to last, the underlying surface and water travel need to be addressed prior to application of the final surface course. The roads on both Islands were not cut with that in mind and need some intense mitigation. From the formation of retention ponds to swales and low-water crossings.

All of the items will be outlined and a unit cost applied to each activity, which will make any approved changes transparent regarding cost. This will be in our,

Speed and Quality come together at a premium and I cannot put together a price based on Speed, Quality, Economy of Scale and maintaining privacy for a project in a piecemeal fashion. I take great pride in performing our work in the best quality possible. If we perform this work, it will be after an approved price and Project Schedule. In order to provide you with these items, I need to know what issues I will be faced with and the issues which are not negotiable. I have no idea of how often or how much notice is or can be provided regarding when privacy is necessary, but it would be productive to stop work on one island while performing work on the one next door. This is just one proposal.

I am going to have to finish up due to other appointments.

I hope I did not give the impression I don't want to do your project. The opposite is the truth. Want to do an organized, clean and quality job, nothing less.

Sincerely,

Ken Floyd

J
jeffrey E. Jun 9, 2017 5:07 PM

Ask god for price timing. If I do not. One at all

A
Ann Rodriquez Jun 9, 2017 9:56 PM
To
jeffrey E.
Cc
Richard Kahn

I'm sorry Bossman,

You would like for Ken to give us an itemized list with pricing and a timeline from start to finish or you don't want anything at all?

Please advise,

Ann R.

1419 files from the DOJ Epstein case media release. All files are public records from justice.gov.

Built by Truth Tide TV