Re: Shipping Updates - May 20, 2019
Thank you Daphne. I have scheduled with the temp. barge for Wednesday to pick up the plants at ABC. Could you please confirm with AC as to how many loads it would be with our 450. Thank you again.
Greetings Mike,
STT Items for transport to LSJ via Little C
ABC Nursery Plants - (25) Sea grape, (20) tree braces for 15J - purchased 5/13 - ready for pickup
Arrived/Sailed/Booked to Sail
BOL 13713967 - Fletcher Larkin Building Supplies - (12) cement bags for construction stock - on STT 5/11- cleared, off-loaded, awaiting pickup
BOL 13720832 - on STT 5/11 - cleared off-loaded, awaiting pickup
- GEI Works - Type 2 H Permeable Silt Barrier for GSJ
- American Export - LSJ GYM Doors & Windows replacement
BOL 13723585 - Lewis Marine - dock lines - on STT 5/14 - cleared, off-loaded, awaiting pickup
BOL 1640387 - 2019 Freightliner 122SD dump truck - on STT - registered, parked, awaiting transport over to LSJ
BOL 13734465 - sailed 5/19 - EDA on STT 5/22
- Tiki Shack Importers - (70) rolls of Thatch
- Wayfair - (100) Pure Garden Solar Path Bollard LED Pathway Lights, per JE
BOL 1366718 - Warren CAT - (1) Caterpillar CS54B Roller with Shell Kit - sailed 5/19 - EDA on STT 5/22
BOL 13677820 - EBL Watercraft - GIBBS Quadski returned to dealer for repairs per JE - at EBL Watercraft in FL
BOL 13623863 - 2015 GMC Yukon Denali (JE) - sailed 5/6 - EDA in Le Havre France 5/26
Awaiting Delivery to Tropical - Or to LSJ via FEDEX, ETC. Hangar Door Specialists - TWA hangar door repairs - materials delivered to STT CARGO 5/9 - sail schedule pending
BeverageFactory.com - Summit Appliance Commercial Outdoor Freezer for Tiki House - shipped 5/15 - EDA to Tropical FL 5/22
Home Depot - H0220-160458 - (2) Samsung washers and (2) Samsung dryers for LSJ - purchased 5/17 - EDA to Tropical FL 5/22
Innovation Solar Garden Products - (2000) Garden lights - production completed - NOW ETD China 5/21- EDA to MIA 45 days - NOW EDA to STT 7/27
Tropicars - (3) 2019 Polaris Ranger EV, rust proofing kit included - purchased 5/10 - Lead Time 12 weeks - EDA ready to ship 8/2
Buck Steel - Project BS36653 Order - 40 x 60 Steel building replacement for Heavy machinery storage - Engineering Deposit paid 4/18 - EDA to Tropical FL pending
Greetings Mike,
One load.
Thank you.
Sent from my iPhone
