arrow_back Search

EFTA02709336

DOJ Epstein Files
folder Dataset 11 insert_drive_file EFTA02709336.pdf description PDF text_fields 160 words · 1.1k chars
open_in_new View original source

From: Daphne Wallace < Sent: Monday, June 1, 2015 4:24 PM To: Jeffrey Epstein Cc: ann rodriquez; Rich Kahn Subject: Fwd: FW: tunnel/ maint Attachments: TUNNEL AND MAINT FLOOR-(6-1-15)_.pdf Greetings Sir, The dimensions from John= as per your request on Friday. Respectfully, 4>=A0Daphne Forwarded mes=age From: John P. Woods, AIA</=> < > > Date: Mon, Jun 1, 2015 at 11:14 AM =ubject: FW: tunnel/ maint To: Daphne Wallace < <mailto », Ann Rodriquez >, Cecile d=Jongh < <mailto Daphne, As requested, floor plans of the existing "tunnel" building and m=intenance building with square footages. JPW Original Message From: JAREDIAN DESIGN GROUP [mak° Sent: Monday, June 01, 2015 11:32 AM To: John P. Woods Subject: tunnel/ maint Here are the existing floor plans with the square footages JAREDIAN DESIGN GROUP Architects, Engineers and Construction Managers 'Ofc Fax www.jaredian.com >1 > > E-mail <http:/ E-mail> This email is free from viruses and malware because avast! Antivirus protec=ion is active. http://www.avast.com=br> EFTA_R1_02115600 EFTA02709336