From: Daphne Wallace Sent: Friday, August 3, 2012 9:48 PM To: Jeffre Epstein Cc: Subject: Potential sixth bay in the Engineering shed - August 3, 2012 Attachments: Old cistern jpg Greetings Mr. Epstein, Danny has a proposal fo= your review: The old cistern in the Engineering s=ed has been drained. It is approximately 20 feet by 14 feet. If a do=r opening is created in the outer wall, these could become a sixth storage=bay. Danny estimates it would be a 12 day project: 2 days to create =he door opening in the outer wall, frame and install the door (the door =s already made), 2 days to wire for electricity, and 8 days to build and i=stall shelving, epoxy the floor and paint. This project will have to be separate from the origina= 5 bays project, since that project must be completed by 8/14. Respectfully submitted, Daphne and D=nny 1 EFTA_R1_01989273 EFTA02680660