From: Daphne Wallace <cl > Sent: Friday, October 19, 2018 9:51 PM To: John P. Woods, AIA, NCARB Subject: Re: Greetings John, Following up on the dis=ussion regarding changes for the Mechanical/RO building roof and Engineeri=g area projects, the proposal is to change the buildings from pre-fabricat=d sheathing to concrete block, retaining the steel framework. It has also been proposed to eliminate the pre-fabricated buil=ing altogether for concrete and concrete block. P=ease let me know if this is your understanding of discussions you have had=recently with Brice, and what Mr. Epstein requested yesterday. <=r> I will look out for your email of the original drawing and pr=posals on Monday. Have a great weekend, Dap=ne On Thu, Oct 18, 20=8 at 6:10 PM Daphne Wallace < > wrote: <=iv dir="ltr">Greetings Sir, I just spoke with John.=C24> He will forward the original design drawings by Monday. He wil= also prepare a proposal for the changes - mechanical, electrical and stru=tural wall - that Brice requested. John stated fu=ther that the structural steel design still needs to be done. The or=ginal design is based upon a pre-engineered steel structure. Respectfully, Daphne On Thu, Oct 18, 2018 at 4:44 PM J=<jeevacation=gmail.com <mailto:jeevacation@gmail.com» wrote: ?? did not receieve the plans ? please note The inf=rmation contained in this communication is confidential, may be attorne=-client privileged, may constitute inside information, and is intended =nly for the use of the addressee. It is the property of JEE EFTA_R1_01822805 EFTA02618704 Unaut=orized use, disclosure or copying of this communication or any part the=eof is strictly prohibited and may be unlawful. If you have received th=s communication in error, please notify us immediately by return e-m=il or by e-mail to jeevacation@gmail.com <mailto:jeevacation@gmail.com> , and destroy this communication and all co=ies thereof, including all attachments. copyright -all rights reservedar> 2 EFTA_R1_01822806 EFTA02618705
