arrow_back Search

EFTA02612140

DOJ Epstein Files
folder Dataset 11 insert_drive_file EFTA02612140.pdf description PDF text_fields 301 words · 1.9k chars
open_in_new View original source

From: Kyle reavis Sent: Monday, December 3, 2018 5:07 PM To: jeffrey E. Subject: Fwd: punch list for work in bathrooms cabana's 1,2,3,&4 Please see below Forwarded message From: Jay Knoepfel &=t <mailto > Date: Mon, Dec=3, 2018, 11:41 AM Subject: punch list for work in bathrooms cabana'. 1,2 3 &4 To: Richard Kah <mailto . =<mailto >, Kyle reavis Cabana #1 1. grout line touch up on peri=eter of floor tile 2. 3. 4. 5. 6. 7. 8. 9. >, brice gordon Adjust window to be paralle= with tile walls and fabricate trim to finish tile surrounding window=and paint Glass door install extend jamb of entrance doo= and trim out glass door area all grout sealed and tile c=eaned finish tile install at door=C240 install shower trim decide and install threshol= at glass shower door round shelf and bench edge<=div> Cabana #2 1. touch up floor grout in two=locations 2. 3. replace one floor tile=under window round shelf edge EFTA_R1_01808071 EFTA02612140 4. 5. 6. 7. 8. extend door jamb and trim ort to finish glass door install install glass door raise floor drain trim out window and paint t=im tile threshold with selecte= material Cabana #3 1. replace wall til= marked with blue tape 2. 3. 4. 5. 6. 7. round over tile edges tune up floor grout where g=out line exceeds common dimension paint ceiling and drill hol=s for lights Prep door opening and plast=r to create finished look install glass door final cleaning of tile and =ealing of grout Cabana #4 1. replace tile edge at shelf =onfigure door opening for glass door 2. 3. 4. 5. 6. remove and replace one floo= tile marked with blue tape round over edges raise floor drain install glass door clean tile and seal grout j=ints 2 EFTA_R1_01808072 EFTA02612141 EFTA_R1_01808073 EFTA02612142