From: Craig Martin Sent: Friday, May 11,1111.1 . M. To: Jeffrey Epstein Subject: Brian's and John's work schedule FYi, =div>5 Palms Window installation. The window company brought their three he=pers. As part of their contract they needed help lifting the windows in pl=ce. L51 workers did help to hold windows as the glass company installed. B=ian and John were part of that team. Brian's Work=Schedule; Monday • Work on maintenance tru=k; drill and replace 5 lug nuts • Helped out in mechanics area as al= mechanics werentremed • Cleaned work shop Tuesday • Finished manufacturing and installing parts on s=n dial • Demolition of maintenance yard • =span>Clean Trailers, ready for sale Wed. • Fix Nanna Trailer, Every part new • Installed two new benches with Peter • Unload Tropical and MSI delivery to 5 Palms • Finish cleaning out 3 40 Ft containers, relocate items • Remove =anhole cover at flag pole pool Thurs. Install desk at grotto • install second desk at =ost u less • Help fix JCB * Deliver =ement board to S palms John's work Schedule; Monday; • Master bedroom install exterior hooks • Interior, adjust shutte hold back hook • New weather strip in re=ax bathroom and door TOES; • Dismantle= shelves in trailers and maintenance work shops EFTA_R1_01712573 EFTA02554874 Wed. * Thurs Craig =idiv> Reset door stop and weatherstrip in relax room <=pan>Complete door, paint and fill with bondo Work on =esk for grotto Remove fan housing gazebo/ cottage , repaint two fans Remove =an housings flag pole, repaint 2 fan housings trailer=clean out project, relocate all household small items 2 EFTA_R1_01712574 EFTA02554875
