From: Larry Sent: Thursday, February 8, 2018 3:14 PM To: Je vacation Cc: Larry Subject: Fwd: N1201E woodwork Jeffrey Adjusted wood quote: $23,500 to change veneer entrance L/H & R/H and Aft=side of cabin door. 2.5 to 3 week down time, once veneer is=located and on hand. $17,500 replace entranc= veneer L & R side,,, and fabricate a Chrome decor Panel to cover the v=neer void by Aft side Cabin Door handle, to match VIP Switch Panel plating.=nbsp; 2.5 Weeks, once veneer is located and on hand,. =/div> Larry, The attached proposal is for your review and approval. I have i=cluded two options, Michael Kelle Pres=dent =p class="MsoNormal" style="margin: Oin Oin 0.0001pe>Plane Perfect Aircraft Interiors, l=c. mkel=e@planeperfectaircraft.com www.planeperfectaircraft.com <http://www.planeperfectair=raft.com/> =/font> Sent from my iPad Begin forwarded message: EFTA_R1_01672693 EFTA02530167 From: <mkelle@planeperfectaircraft.com <mailto:mkelle@=laneperfectaircraft.com» Oate= February 8, 2018 at 9:46:25 AM EST To: <Ivjet@aol.com> Cc: <ar@planeperfectaircraft.com <mailto:ar=planeperfectaircraft.com» Subject= N120JE woodwork Larry, The attached p=oposal is for your review and approval. I have included to options, t=e first is to replace all the veneer on the cabin door aft side and the sec=nd is to fabricate a aluminum decorative plate and glue it to the door that=is plated to match the existing decor. Let me know what you think.&nbs=; </=pan> =i>Plane Perfect Aircraft Interiors, Inc. 1300 N Florida Mango Rd, Suite 32 West Palm Beach, FL 33409 Cell: (561) 307-6746 <= href="mailto:mkelle@planeperfectaircraft.com">mkelle@planeperfectaircraf=.com www.planeperfectaircraft.com<Apan></=> 2 EFTA_R1_01672694 EFTA02530168
