From: Gary Kemey Sent: Monday, May 16, 2011 6:39 PM To: Jeffrey Epstein Cc: Emad Hanna; =BODY> =DIV>schedule for the 4th =/FONT> =DIV> =DIV>Main pool =DIV> the building slab will be =oured and block going up =DIV> the pool equipment will be =nstalled and water in pool =DIV> the retaining walls around cottage will be up =DIV> the deck will be concrete,ready to lay tile(tile comes =fter the building is stoned) =DIV> =DIV>still on target for 10/3 =DIV> =DIV>Flag pole pool =DIV> =DIV> the building will be framed in and plastering =nderway =DIV> the pool equipment will be in and water in the pool =assumes we get tile selection) =DIV> the deck will be concrete(tile happens after shelter =nd plaster) =DIV> walls will be underway =DIV> =DIV>still on target for 9/15 EFTA_R1_01367329 EFTA02368397