To: From: Vicki Beltz Sent: Wed 9/2512013 6:33:33 PM Subject: Re: Deposit Ok. Will do Sent from my iPhonc On Sep 25, 2013, at 2:25 PM, wrote: We need to order the time for basement too. Bob says We can't do the fiberglass drop in Sent from my iPhone On Scp 25, 2013, at 1:57 PM, "Vicki Benz" vrote: I can make them for you if you want, no problem. From: Sent: Wednesday, SellIFFIR To: Vicki Beltz Subject: Re: Deposit Oh man I Better get those pictures and make copies! Thx Sent from my iPhone On S • 25, 2013, at I:52 PM, "Vicki Boltz" otc: Hi Bob was in and gave me a check for final on the Master tile and a deposit on the other areas except the Basement Bath. I will let you both know when everything is ready for pick up. I also gave him a copy of the layouts that Dale went over with you. This way he can communicate with the installer directly and hopefully you won't need worry about that too much. Let me know if you need anything else. Thanks, Vicki A. Beltz Design Consultant Stepping Stones Marble & Granite 3 Morse Court EFTA_R1_00768405 EFTA02128063 EFTA_R1_00768406 EFTA02128064
