To: From: Sent ec 6:25:30 PM Subject: Re: Deposit We need to order the time for basement too. Bob says We can't do the fiberglass drop in Sent from my iPhone On Sep 25, 2013, at 1:57 PM, "Vicki Beltz" wrote: I can make them for you if you want, no problem. From Sent: Wedne , To: Vdd Beltz Subject Re: Deposit Oh man I Better get those pictures and make copies! Thx Sent from my iPhone On Sep 25, 2013, at 1:52 PM, "Vicki Beltz" wrote: HI Bob was in and gave me a check for final on the Master tile and a deposit on the other areas except the Basement Bath. I will let you both know when everything is ready for pick up. I also gave him a copy of the layouts that Dale went over with you. This way he can communicate with the installer directly and hopefully you won't need worry about that too much. Let me know if you need anything else. Thanks, Vicki A. Beltz Design Consultant Stepping Stones Marble & Granite EFTA_R1_00788355 EFTA02128029
