To: IIIIII From: Sent: Wed 9/25/2013 5:52:02 PM Subject: Deposit Hi Bob was in and gave me a check for final on the Master tile and a deposit on the other areas except the Basement Bath. I will let you both know when everything is ready for pick up. I also gave him a copy of the layouts that Dale went over with you. This way he can communicate with the installer directly and hopefully you won't need worry about that too much. Let me know if you need anything else. Thanks, Vicki A. Beltz Design Consultant Stepping Stones Marble & Granite EFTA_R1_00768227 EFTA02127958
