arrow_back Search

EFTA02013762

DOJ Epstein Files
folder Dataset 10 insert_drive_file EFTA02013762.pdf description PDF text_fields 180 words · 1.1k chars
open_in_new View original source

To: 'eevacation mail.com eevacation@gmail.comb Jeffrey Epsteinbeeyacation©gmail.com]; From: Carlos Rodriguez Sent Sat 9/1/2012 6:20:15 PM Subject Big N Overhaul Greetings all as per my visit today to haulover marine, there has been quite a lot of work done on Big N. The front part of the gate has been repaired it was completely broken away they put a new metal piece all the way across. Both sides of the front part of the hull had heavy pitting possibly leaking into the haul were repaired with new half inch aluminum plate welded on. The struts these hold the shaft and prop both were loose and had heavy pitting, they were rewelded to the hull. New flanges were welded to rudder and rudder posts, propellers were polished and hull was sanded and painted. Bosco has been managing all these projects, purchasing materials while also working on the hydraulics so haulover could remove bottles, hes also been dealing with engine alignment. They should be able to splash tuesday and come to red hook to do rest of inhouse work. thankyou Carlos Rodriguez EFTA_R1_00516229 EFTA02013762