arrow_back Search

EFTA02006616

DOJ Epstein Files
folder Dataset 10 insert_drive_file EFTA02006616.pdf description PDF text_fields 383 words · 2.7k chars
open_in_new View original source

To: 'eevacation mail.com 'eevacation mail.com Jeffrey Epsteinbeeyacation©gmail.corn] Cc: Fran: ap ne a ace Sent Wed 8/1/2012 7:06:08 PM Subject: Danny's list of projects and current staff - August 1, 2012 Greetings Mr. Epstein, Danny's list of projects and current staff: Landscapers: Tying down all palm trees for hurricane season - finishing the basket, Five Palms is next - complete 8/1, then securing shutters on all buildings Peter St. Omer Anthony Jules Dupson Donnissaint Ednor Montina Guseneme Dalce Onel Pierressaint Reno! Medc Housekeepers: Following the schedule of cleaning protocol in place by Karen - Danny does daily walk throughs to check the a/c settings and lights Basilia Mercado (Dulce) Maria Rosario (Katie) Reyna Amparo (Sandra) Carpenters Brian Bates - woodshop tunnel, dismantling the old desal, putting up the subwall in the old engineering office, addressing the Five Palms fire pit Gregory Montina - temporary helper - with Brian's projects Victor Amparo - temporary helper - with Brian's projects Clement (Allangie) Clifton: doors and door frames for the 5 engineering bays, dock box table top, lay blocks at the Five Palms transformer protection shelter Benford (Benny) Lewis: working with Clement Mechanics Sharimo Wheatley - today assisting with loading the batch plant for transport off island Karl Henry - assisting the loading of the batch plant Sheridan Elizee - keeping the boats cleaned, rust-free, maintaining the small landscaping equipment Maintenance Cuthbert Titre (Smiley) - maintains the pools, RO, small repairs to irrigation lines, record keeping of all the desal, generator maintenance records, vehicle maintenance lid= Guy Vicars - barge mate, assists in facility repairs, large plumbing repairs, will clean the bilges on Big N, complete a main water line upgrade, assist Danny EFTA_R1_00508082 EFTA02006616 Painters Gary Titre - finish Berm stone threshold, paint the woodshop tunnel walls, paint the Engineering bays walls, floors, shelving Hilian Bedminister (TJ) - working with Gary Jules - loading the batch plant today, contining to smooth out the roads, will replace the Berm boulders when the stone threshold is complete, sifting dirt for topsoil Felito Joseph (Little Buck) - general trucking, trash runs Danny - Five Palms fiber repair, install breakers for a/c in mechanical desal, research transient surge protection, library bookshelf lights need low voltage transformers, genset wiring, rewire and Engineering shed 5 bays Respectfully, Daphne and Danny EFTA_R1_00506083 EFTA02006617