arrow_back Search

EFTA02005379

DOJ Epstein Files
folder Dataset 10 insert_drive_file EFTA02005379.pdf description PDF text_fields 223 words · 1.4k chars
open_in_new View original source

To: jeevacationftmail.com[jeeyacation©gmaitcom]; Jeffrey Epsteinbeeyacation©gmail.corn] From: Zorro Ranch Sent Tue 8/21/2012 2:06:31 PM Subject Fwd: Drilling Update Will get cost for compressor Recommend going to 800 and Then do air lift to get a basic idea of yield This is drillers approach as well Sent from my iPhone Begin forwarded message: From: Casey Cook Date: August 20, 2012 6:5J/IIII I” To: brice gordon Subject: Drilling Brice G.; As we discussed, the drill crew reached 640 ft in the exploratory borehole tonight with no observations of significant fluid loss. The driller has indicated he may be able to switch to an airlift operation without damaging the borehole, which will allow a preview of the how much water is coming from the hole. The operation will require an additional compressor that will add to the drilling cost, but it may be the only way to see how much water this hole can produce. With your approval, I will direct the drillers to set up for an air operation. I have a call into Ronnie Dennison at HGS to discuss the logistics and schedule for making the transition to air. I will let you know what he says. Please call to discuss any of this. Casey W. Cook, P.E. Belleau Groundwater, Inc. 901 Rio Grande Blvd. NW Suite F-242 Albuanwmnw. NM 87104 www. a eau.com EFTA_R1_00504179 EFTA02005379