arrow_back Search

EFTA02004395

DOJ Epstein Files
folder Dataset 10 insert_drive_file EFTA02004395.pdf description PDF text_fields 232 words · 1.4k chars
open_in_new View original source

To: jeevacation@g mail.com[jeevacation@gmail.com]; jeevacation mail.com 'eevacation@gmail.com] From: Sent: Fri 3/4/2011 3:59:52 AM Subject: Gil update Jeffrey, Tstat is installed and working, APU is not as smooth as I thought it would sound when accelerating from 80% to 100%, the part we installed is 41 years old, so that could be an issue,.We are doing functional checks of the AK) Surge Valve, which is the last part of the air system involved in starting. Surge valve will arrive tomorrow from Savannah at 10:30am is what I'm being told, just in case we elect to install it,. I'm fine with APU operation at this point, so we can depart if you like any time tomorrow,. I will know more around midnight tonight if a problem with surge valve is found„ only takes 1.5 hours to install,. I did not want to delay your departure,.) can always install when we do the below floor inspection,.if there is an issue found with surge valve,. The technicians at Long Beach are marginal as far as Gil knowledge, they are folowing the Tech supports recommendations,.only one guy is approved to run APU, all others are GIV and up specialist,. Boost pump operation normal., changed boost pump Relay for UH side, and two pressure switches,. I will update you if any findings on surge valve,.let me know if there is a departure time yet? thank you, Larry EFTA_R1_00502722 EFTA02004395