arrow_back Search

EFTA01926925

DOJ Epstein Files
folder Dataset 10 insert_drive_file EFTA01926925.pdf description PDF text_fields 175 words · 1.1k chars
open_in_new View original source

To: 'eevacation mail.com 'eevacation maitcom] Cc: From: Lvjet Sent: Wed 5/7/2014 10:51:54 PM Subject: GIV update Jeffrey, Flight time: TEB - STT is 3+13min (+34kt tailwind). Test flight on GIV today went well, -I was pleased with Door seal, inflates fully and db lever is much lower in fwd cockpit area with sound proof material on cabin door. -charging dock for stereo remote looks amazing,. / Down wash lights above credenza have been replaced,./ dish, salt and pepper and several drawers in galley have dividers installed. -it was tough to find smooth air during todays flight. I brought Julian, Mx shop manager, most of flight felt smooth, brief moments our light buffet was present, so I was able to demonstrate to Julian our concerns,. only issue during flight was cockpit windshield heat regulator failed, part will arrive 9am tomorrow and should be completed by noon. I'm planning to reposition to Teterboro by 3pm for our departure let me know if there is a chance you will depart earlier than 6pm? thank you, Larry EFTA_R1_00373730 EFTA01926925