To: Jeffrey Epsteingeevacation©gmail.com] From: brice gordon Sent Sat 5/19/2012 2:18:37 PM Subject: Fwd: Zorro New Well Drilling, (Well K) as requested ----- Forwarded message From: brice gordon <MM> Date: Wed, May 16, 2012 at 9:31 AM Subject: Zorro New Well Drillin Well K To: Craig Martin , Rich Kahn Cc: Zorro Ranch Well Drilling the only thing at this time that is not included in bid is 800 ft of control wire for well operation 800 ft of wire to power well 800 ft of pipe the plan is to rest well 4 for a period of time, to test new well. In doing so we would disconnect well 4 controls and wire in new well controls. This would cut back on cost of purchasing well controls at this time. please controls are for on and off operation of well and distribution pumps Maybe in the future a separate control panel could be installed Wire and pipe estimates would be rough, pump size is determined after drilling is done I will estimate for best case scenario for 100 gpm pump please note new well needs to be operational and tested by jan 15 2013, due to the fact that by Jan 15 2014 we have to prove/use 25% of the 68 afa permitted allotment. The dates are firm and are part of a settlement agreement with the WRD, NM If the well is drilled by end ofjune, this will only leave 3 months at best for testing. any questions or concerns please advise Brice Gordon Little Saint James USVI Phone: EFTA_R1_00299452 EFTA01884602 Brice Gordon Little Saint James USVI Phone: EFTA_R1_00299453 EFTA01884603
