arrow_back Search

EFTA01833151

DOJ Epstein Files
folder Dataset 10 insert_drive_file EFTA01833151.pdf description PDF text_fields 324 words · 2.3k chars
open_in_new View original source

To: Jeffrey Epstein eevacation mail.com Cc: K F Sent: Mon 1/31/2011 9:51:42 PM Subject: Photographs - January 31, 2011 Landscaping behind master suite.JPG Landscaping behind master suite (2).JPG Landscaping behind master suite (3).JPG Landscaping behind master suite (4).JPG Landscaping behind master suite (51.JPG Landscaping behind master suite (6).JPG Landscaping behind master suite (7).JPG Landscaping behind master suite (81.JPG Dock pad excavation.JPG Dock pad excavation (2).JPG Dock pad excavation (3).JPG Dock pad excavation (4).JPG Entry way proiect.JPG Entry way proiect (2).JPG Entry way proiect (3).JPG Entry way proiect (4).JPG Entry way project (5).JPG Entry way proiect machine.JPG Ion work on faceplates cottage 1.JPG Ion work on faceplates cottage 2 (21.JPG Ion work on faceplates cottage 2.JPG Ion work on faceplates cottage 3 (2).JPG Ion work on faceplates cottage 3 (3).JPG Ion work on faceplates cottage 3.JPG Master suite foyer sconces.JPG Master suite foyer sconces (2).JPG Master suite foyer sconces (3),JPG Master suite foyer sconces (4).JPG Master suite tub room.JPG Outdoor tub.JPG Outdoor tub (2).JPG Outdoor tub (3).JPG Outdoor tub (4).JPG Stairs to master suite.JPG Stairs to master suite (2).JPG Stairs to master suite (3).JPG Nanna painting.JPG Nanna painting (2).JPG Handrails proiect.JPG Greetings Mr. Epstein, rice Gord In response to your directive that the canary should be centered on the opening, Gary advised that it was necessary to plant the palm far enough away from the master suite so the palm fronds do not interfere with the roof gutters. Brian has been advised to place buffers between the floating dock and the pilings. EFTA_R1_00211419 EFTA01833151 Photographs of January 31, 2011, for your review and comments: Landscaping behind master suite progress Dock pad excavation Entry way project - the additional boulders and the machine are on site to begin repositioning the boulders into place tomorrow Ion's work on the faceplates in the cottages Master suite foyer sconces installed Master suite tub room Stairs to master suite tiling Outdoor tub Nanna painting Handrails Respectfully submitted, Daphne EFTA_R1_00211420 EFTA01833152