arrow_back Search

EFTA01791608

DOJ Epstein Files
folder Dataset 10 insert_drive_file EFTA01791608.pdf description PDF text_fields 227 words · 1.4k chars
open_in_new View original source

From: Sent: Friday, March 4, 2011 4:00 AM To: jeevacation@gmail.com Subject: Gil update Jeffrey, Tstat is installed and working, APU is not as smooth as I though= it would sound when accelerating from 80% to 100%, the part=we installed is 41 years old, so that could be an issue,.We are doing functio=al checks of the APU Surge Valve, which is the last part of the air system involved in starting. Surge valve will arrive tomorr=w from Savannah at 10:30am is what I'm being told, just in case we=elect to install it,. I'm fine with APU operation at this point, so we can depart if you li=e any time tomorrow,. I will know more around midnight tonight if a problem with surge valv= is found„ only takes 1.5 hours to install,. I did not want to dela= your departure,.) can always install when we do the below floor inspection,.if=there is an issue found with surge valve,. The technicians at Long Beach are marginal as far as GIl knowledge, they are following the Tech supports recommendations,.only one=guy is approved to run APU, all others are GIV and up specialist,. Boost pump operation normal., changed boost pump Relay for L/H side, and two pressure switches,. I will update you if any findings on surge valve,.let me know if ther= is a departure time yet? thank you, Larry 1 EFTA_R1_00121851 EFTA01791608