arrow_back Search

EFTA01790610

DOJ Epstein Files
folder Dataset 10 insert_drive_file EFTA01790610.pdf description PDF text_fields 164 words · 1.0k chars
open_in_new View original source

From: Sent: Wednesday, March 2, 2011 9:22 PM To: jeevacation@gmail.com Subject: Gil update Jeffrey, Gulfstream is planning to work APU and boost pump on second shift tod=y at 3pm, Quality Control is researching and hopes to approve the T-Stat install that I brought with on plane, the paper work that came with=the Tstat is 1970 build date, three other Tstat's are listed=20 in parts data base system, but are not ready to ship since they are waiting bench testing,. There is also a pressure test of pneumati= system for Tstat, Gulfstream is checking to see if this break out box=is on hand in Long Beach,. -Boost pump issue's will be addressed by Avionics tonight,. suspect=20 corrosion on canon plug in wheel well, and filter down stream of pump,. ar= area's we are looking, in addition to Circuit Breaker integrality, 50amp,. If you approve of below floor inspection in Long Beach, Gulfstream ca= start Thursday,. I will keep you posted, thanks, Larry 1 EFTA_R1_00119243 EFTA01790610