arrow_back Search

EFTA01124871

DOJ Epstein Files
folder Dataset 9 insert_drive_file EFTA01124871.pdf description PDF text_fields 285 words · 1.8k chars
open_in_new View original source

RMC Electric-Randy Morales P 0 Box 10645 Albuquerque NM 87184 Phone: 505-342-0800 Fax: 505-342-0811 Estimate/Bid June 18, 2012 Ann: Brice To: Zorro Ranch Job: Well K Estimate 1) 300ft of 2" PVC 2) 2-2" LB 20/ea 3) 1- 2 pole, 100 amp breaker 4) 1- 100 amp main breaker indoor panel 5) 3- 300ft runs of 1/0 copper Thhn wire 6) 1- 300ft run #2 copper Thhn ground 7) Miscellaneous fittings Materials 3,952.00 Labor 3,560.00 $7,512.00 202.00 40.00 150.00 200.00 2,750.00 360.00 250.00 Note: 1) Digging for 100amp circuit from meter to well is excluded from price 2) Well control wiring not included in price Option 1) If 480volt, 3 phase motor is used, add this amount to above price 20HP 3 sub add-a-phase 9,300.00 Labor & materials to install 900.00 Must be within 10ft of well motor starter Freight cost will be added to price and is to be determined Option 2) 480 Volt single phase 1) One 250 amp, 480 volt single phase panel 2) One 250 amp main breaker kit 3) One 75KVAA step up transformer 240 to 480 4) Miscellaneous material to install transformer and connect to well motor starter 5) Labor to install and connect 300.00 260.00 3,050.00 390.00 900.00 Change orders will apply if extra work is needed varying from the above stated. Any alteration or deviation from the above specifications will involve extra costs and written order and will become an extra charge over and above the estimate. All agreements are contingent upon anything beyond our control Acceptance of Proposal The above prices. specification and conditions are satisfactory and are hereby accepted. RMC Electric is authorized to do the work as specified.Date: Signature: Thank you -Randy Morales. EFTA01124871