open_in_new View original source

Scope of Work GSJ Infrastructure • Main link o The same type of WAPA power cable used for LSJ (Power copper for the outer rings and single mode fiber in the middle. o The GSJ Fiber run ■ Starts from LSJ Data Center (the location of the Power Transformer to should be close to LSJ Data Center) ■ Upgrade Main Switch /add second switch - to provide for more fiber ports o Phones ■ Option 1 • Upgrade existing switch for more extensions • Add more service lines / split existing service line between LSJ and GSJ ■ Option 2 • New phone switch • GSJ has its own Phone Numbers o Internet ■ LSJ shares bandwidth with GSJ • GSJ Data Center o Location to be determined by JE o Equipment needed ■ Rack ■ Switches ■ Battery Backup {Danny / JE to verify if GSJ will have its own generators or will LSJ be able to Share power} EFTA01120411 • Pull Through o Verify with Danny on the strategic areas for (2) Main pull vaults and manhole ■ JE to approve GSJ tour with Danny • Possible Fiber crew if JE approves ■ Document and Map vault and manholes as we progress Buildings • JE to approve types of building and what services to be installed in each such as the following: 1. ( Theater - Phones, Audio /Video, wireless network, and Computer) a. Blackboxes in each area with a switch, battery backup, and patch panel b. Access Points in all Buildings Questions: Is Solar an option? Should cameras be installed? EFTA01120412