Construction Proposal January 9, 2016 The Owner: The Contractor: The Project: LSJ Little St. James Island St. Thomas, VI Betteroads Asphalt LLC PO Box 301946 St. Thomas, VI 00803 1-8593-IL LSJ Crusher Run Test Strip Little St. James Island USVI SCOPE OF WORK: Provide labor and equipment to place and compact crusher run test strip for owner's observation. Crusher run material to be provided by owner; • Test strip area measuring 12ft. (W) x 800ft. (L) x 5in. (D) TOTAL BASE PRICE: $6,842.40 LSJ Crusher Run Test Strip January 9. 2016 1 of 2 EFTA01087968 Project Totals: Name Crusher Run Rest Strip Quantity Unit Cost Unit Total Cost Materials Placement 250 $7.50 Ton 31,875.00 Compaction 250 $12.50 Ton $3,125.00 Equipment Mobilization 1 $950.00 LS $950.00 Subtotal $5,950.00 Company Overhead & Margin Company Overhead Percentage 15.00% N/A Percent of Costs $892.50 Grand Total $6,842.40 LSJ Crusher Run Test Ship January 9. 2016 2 of 2 EFTA01087969