ALT AsirtROAOS ASPHALT CORP Construction Proposal August 7, 2015 By the Contractor: For the Project: Betteroads Asphalt Corporation #3G Turpentine Road Estate Bovoni St. Thomas, VI 00802 United States 1-8593-1L LSJ_Added Aggregate Base Little St. James Island VI SCOPE OF WORK: Place and compact 3 inches aggregates base as per plan TOTAL BASE PRICE: $90,712.00 Project Totals: Name Aggregate Quantity Unit Cost Unit Crushed stone Aggregate Base 1.360 530M0 Ton Materials Transport Trucking and Hauling 68 $400.00 Each Excavation and Fill Loading and/or Spreading Base Structural Compaction 1360 $3.00 $5.00 Mil 1360 Ton Company Overhead Company Overhead Percentage 15.00% $0.00 Percent of Costs Total Cost S40.S(X).(X) $27.200.00 54.050.00 56.800.00 511.832.(g) Grand Total $90,712.00 Page I of LSJ Added Aggregate Proposal EFTA01087967