arrow_back Search

EFTA01038259

DOJ Epstein Files
folder Dataset 9 insert_drive_file EFTA01038259.pdf description PDF text_fields 282 words · 1.9k chars
open_in_new View original source

From: Richard Kahn To: "Jeffrey E." <jeevacation@gmail.com> Subject: Fwd: August ProSolar ProCare Service Date: Wed, 09 Aug 2017 17:32:20 +0000 Attachments: GSLAugust_ProCareinvoice.pdf Inline-Images: FLIR0020jpg; FLIR0021jpg; FLIR0022jpg; FLIR0024.jpg; FLIR0025.jpg; FLIR0026.jpg; FLIR0027jpg; FLIR0028.jpg Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 Begin forwarded message: From: Subject: August ProSolar ProCare Service Date: August 8, 2017 at 12:36:37 PM EDT To: "Richard Kahn" Cc: Hi Rich, This visit focused on the island grid layout and 3-phase distribution design. The grid has historically had a major power draw around 2am. We found several easy changes that need to be made my Danny Vickers that might solve this problem. Some of the distribution panels on the grid have neutral and grounds bonded together which can cause a "voltage loop" and send power directly to ground when power consumption takes place. The ground and the neutral should only bond in one place and that is the multi-cluster box in the battery room. We also thermal imaged all the main electrical connections on the island. We found a few charred wires that were trimmed and re-seated to eliminate fire hazard. Danny and I concluded that he could easily upgrade the main panel under the main house to a 200A 3-phase panel instead of the current situation which is 3-phase distribution but single phase energy usage. This creates an imbalance and leads to a major loss of efficiency. We will continue to watch the systems performance and once these changes are made we will check to see if we are still experiencing the 2am battery drain. The attached pictures show heat signatures we are addressing. Some of them have been rectified already. EFTA01038259 i EFTA01038260