arrow_back Search

EFTA01016960

DOJ Epstein Files
folder Dataset 9 insert_drive_file EFTA01016960.pdf description PDF text_fields 173 words · 1.1k chars
open_in_new View original source

From: Nice gordon To: Rich Kahn Cc: J <*eevacation a mail.com>, michael glidden LSJ GSJ , Kyle reavis Subject: LSJ RO Fiber Date: Sun, 11 Nov 2018 16:10:49 +0000 Attachments: LSJ_Conduit_.pdf; Little_St James_Island_-_Fibre_Link_for_RO_plant_Rev_0_11-1- 2018_11.57.16_AM.pdf Hello Rich Attached: AVL Proposal, Supply and Terminate, Fiber Link of between the RO Plant and Sea Water Intake Pumps. Cost:$2753.69 Rogers Electric for Conduit. Cost:$7520.43 plus shipping Estimated Cost: $10,274.12 We are unable to Pull New Fiber in the the Existing Conduit from the Generator Building to Sea Water Intake Pump Controls. The fiber connection allows the RO Plant to communicate to the Sea Water Intake Pumps located outside the Tunnel. The conduit is for the Duct Bank, to be dug from the Generator Building out to the Sea Water Intake building, with a new feeder for GSJ. At this time the Sea Water Intake pumps are being run in Manual Mode. LSJ will Dig, Install conduit and Pull Fiber. Can we proceed with ordering Fiber and Conduit? regards Brice Cordon The Saint James Group USVI Ph EFTA01016960