arrow_back Search

EFTA00894624

DOJ Epstein Files
folder Dataset 9 insert_drive_file EFTA00894624.pdf description PDF text_fields 280 words · 1.9k chars
open_in_new View original source

From: Lany Visoski <Ila> To: Je vacation <jeevacation®gmail.com> Cc: Rich Kahn Subject: LED update Date: Thu, 28 Jun 2018 21:25:50 +0000 Jeffrey Pete spoke with ALI. aircraft lighting International Same company Eric uses for LED lights, According to sales person, no potentiometers are required in the LED system light change, From Pete; Hi Lany, I spoke to Shervin today￾There are no potentiometer or other components required. Each of the 4 existing power supplies are replaced. Minor change in pinouts for plugs. Bulbs are plug in, mount brackets (included) may have to be replaced due to difference in bulb diameter. System is PMA Approved, no need for additional FAA documentation. It would take 3 to 4 business days to assemble components after order is placed. He estimates 2 to 3 days for the installation which could be done at TEB. Would the arrival on the 8th leave us time before next trip? If so, need to place order soon￾Regards, Pete Sent from My I-Pad Begin forwarded message: From: Shervin Rezaie Date: June 28, 2018 at 3:57:45 PM EDT To: Pete Rawson Subject: Re: Scanned from Meridian Hangar 107 Hi Pete, Great speaking with you today. Below you'll find the quote updated. If you need anything else please do not hesitate to call me. Thanks, Shervin EFTA00894624 ORIGINAL PNS ALI PN QUANTI TY Cast Each TOTAL 1800.100. 2.1.21/09 L5800-300-45 IS $851.00 $15,118.00 5800405. 2.121/09 L5800-105-45 3 $400.00 $1,200.00 1800481. 212M L5800-285-45 24 $851.00 $20,424.00 1800.120. 252000 L5800-120-45 S $400.00 $3,200.00 Wag; n R itgOeVa 4 $700.00 52,800.00 Grad Total $42.942.00 General Manager Aircraft Lighting International 195 Engineers Road Haup pa e, NY 1 1788 Cell: Office: www.aircraftlighting.com Sent from my iPhone EFTA00894625