arrow_back Search

EFTA00878552

DOJ Epstein Files
folder Dataset 9 insert_drive_file EFTA00878552.pdf description PDF text_fields 201 words · 1.2k chars
open_in_new View original source

From: emad hanna To: "Gary Kerney" Cc: Jeffrey Epstein <jeevacation®gmail.com> Subject: Re: Date: Mon, 16 May 2011 21:26:38 +0000 Gary, Other items that I have not seen you respond to are (unless you responded to JE and did not include me on the e mail) Ion Schedule Dock House More People Tile Layer Nursery Floor Mowing Fire Fuel Desalination Mechanical done by 4/17 Thank you Emad Hamm Project Controller HBRK Associates 301 East 66th St Suite 10F New York, NY 10065 Cell LSJ Office St. Thomas NY Office Fax On May 16, 2011, at 2:38 PM, Gary Kemey wrote: schedule for the 4th Main pool the building slab will be poured and block going up the pool equipment will be installed and water in pool the retaining walls around cottage will be up the deck will be concrete,ready to lay tile(tile comes after the building is stoned) still on target for 10/3 Flag pole pool EFTA00878552 the building will be framed in and plastering underway the pool equipment will be in and water in the pool (assumes we get tile selection) the deck will be concrete(tile happens after shelter and plaster) walls will be underway still on target for 9/15 EFTA00878553