arrow_back Search

EFTA00873763

DOJ Epstein Files
folder Dataset 9 insert_drive_file EFTA00873763.pdf description PDF text_fields 266 words · 1.7k chars
open_in_new View original source

From: Jeffrey Epstein <jeevacation@gmail.com> To: Ivjet Subject: Re: GII item Date: Fri, 14 Jun 2013 18:31:09 +0000 okk, thanks On Fri, Jun 14, 2013 at 8:26 PM, c wrote: Jeffrey, During my pre flight, I noticed my parking brake accumulator reading 1000psi, which is my nitrogen preload on the accumulator, When I turn on my Aux pump to build pressure for my parking brake, its suppose to build my pressure to 3000psi, when I turn on aux pump to build extra hydraulic pressure, it only charges my brakes to 1300psi not 3000psi, sounds like a pressure switch is faulty or sticking,. I have normal brakes with engines running due to combined hydraulic system and my backup system is utility hydraulic system which operates normal also,. I feel confident to fly the plane and change this pressure switch in either St thomas or Teterboro. I tried tapping of the psi switch to no avail. I just wanted you aware of my findings, I spoke to Gulfstream tech ops to verify my conclusion. thx Larry Sent via BlackBerry by AT&T The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jeevacation®gmail.com, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA00873763